13/09/2026
Here is another recently finished exterior project. 35 meters of steel balcony and stair railings. This job was very labour intensive. It took three tradesmen three days to scape sand and clean the railing backs back to a solid surfaces.
We then coated the railing with Dulux highbuild ZP epoxy primer and finished with 2 x coats of Dulux
FERRODOR 810. This is a single pack alkyd enamel containing a high level of micaceous iron oxide. The micaceous iron oxide pigment particles interlock in the film to form a barrier against moisture ingress and improve resistance to degradation by UV light.