14/10/2026
Every correction costs. 🚜
Rework costs more than time.
⛽ Extra fuel
⏱️ Extra machine hours
🚚 Extra material to move and haul
👷 Crews and machines waiting
📐 Additional surveying and checks
For contractors working on fixed-price projects, those costs matter because doing more work does not necessarily mean getting paid more.
On Total NSA’s motorway project in Romania, the design required 0.4 m of material to be stripped. On the manually graded section, excavation went up to 30 cm deeper than planned, roughly 75% more depth than required. That meant additional material and work that were not part of the planned job, but still consumed time and resources.
With Leica 3D machine control, operators can work directly towards the digital design with guidance available in the cab. This can help reduce over-digging, repeated checks, unnecessary machine passes, and the rework that follows.
Less unnecessary work. Better control of costs. More protection for your margin.
👉 Swipe through to see where the cost of rework can add up.
https://hxgn.biz/4dfY029