05/12/2025
📣 Bathroom Floor Renovation + Office Ceiling Refresh – Project Breakdown
Another project lined up for next week! 💪
Here’s a look at the stages involved in this bathroom floor renovation, along with a small painting job in the office.
---
🔧 Project Stages
1️⃣ Tile Removal & Preparation
Removing the existing floor tiles throughout the bathroom.
Lifting the bath and toilet so the new floor can be installed properly.
Full clean-up and preparation of the subfloor.
2️⃣ Priming & Self-Levelling
Applying a high-quality primer.
Pouring self-levelling compound to get a smooth, solid base ready for tiling.
3️⃣ New Tile Installation
Laying new floor tiles supplied by the client.
Precision cuts around the curved shower tray for a clean, tight finish.
Grouting and sealing for a long-lasting, waterproof result.
4️⃣ Reinstalling Fixtures
Bath and toilet reinstalled once the floor has set.
Door trimming to suit the new tile height.
Final silicone finishing and clean-up.
💼 Another job booked and prepared with care
At Darro Premium, I always make sure the client understands the full process, timeline, and finishing details. Quality materials, tidy work, and proper preparation make all the difference.
If you’re planning bathroom upgrades, flooring work, painting, or general home improvements — feel free to get in touch!
📩 [email protected]
📍 Basingstoke & surrounding areas