TCP Property Solutions

TCP Property Solutions 🔸Civil Engineering Degree Apprentice 🏗️
🔸Learning and sharing my property renovation journey 🏡
🔸Aspiring to design homes with attention to detail 🔍

10/07/2026

4 days later... And It's done (sort of)
Made a plan 📝... Executed the plan 😮‍💨
Time to enjoy living life for a couple weeks 🍻🇺🇸

06/07/2026

This week is going to be an absolute killer but let's see if I can get it over the line. 🎨

What do you think? Entire house paint job in 4 days while working a 9-5 🤔

21/06/2026

Out with the old and in with the new and improved 📈

🔸Correct sized joists
🔸150mm PIR Warm deck
🔸3-Layer Felt system
🔸2 tone soffit, fascia and guttering

Another one of the big jobs that's been done during this build which isn't obvious from a glance around

18/06/2026

The £5,000 renovation mistake nobody warned me about…

I stripped more than 50% of the plaster from this house, and Building Control immediately classed it as a thermal renovation. That meant insulation upgrades, additional materials, extra labour, and a much bigger bill than expected.

If you’re renovating an older property, this is something you need to know before you pick up a hammer.

Taking all the plaster off meant I had to put the house back together to achieve a 0.3 u-value. This required:

🔸 67.5mm insulated plasterboards on all external walls
🔸 150mm PIR Insulation in all the eves
🔸 150mm PIR insulation warm deck flat roof
🔸 50mm PIR insulation build out in the bathrooms to maintain a service void
🔸 Maintain the existing 25mm EWI on the house (External Wall Insulation)

However they also said I don't have to insulate the wall where the stairs are as it will encroach onto the steps 🤔

They make the rules up as they go along to suit themselves if you ask me 🤷‍♂️

10/06/2026

It's been a while so let's take a look back at the past 5 months of work and what's changed to the Lanehouse Project 🤔

The TCP social media revival begins now 🫡

Think I need to find a few synonyms for "since" too 🤣

04/05/2026

Lanehouse Update Week 16 🕓

Bald spots, poo pipes, bathroom furniture and fat circles in the house walls but it's all almost ready for some plasterboards 🤩

Need to swallow a 2.5k materials invoice first 😳

26/04/2026

Lanehouse Update Week 15

It's been a while ey. The TCP ig neglect has come to an end I hope but don't worry the project has still been ticking over. But I think it's about time we ramped up the pace 👀

30/03/2026

Lanehouse Update Week 11

The flat roof is finally ready for its deck and soon we will be able to appreciate the full space we have created by removing the wall between the living room and kitchen 🤩

23/03/2026

Lanehouse Update Week 10

Better late then never 🫡

15/03/2026

Lanehouse Update Week 9

Next up we need to concentrate on both the kitchen flat roof (once the brickwork is up) and getting the plumbing and electrics back in for first fix. The concrete pour all needs to happen soon to give it a bit of time to cure as well as reworking the bathroom layouts for optimisation.