Dave's property maintenance

Dave's property maintenance Top quality maintenance and bespoke work in Calderdale and surrounding areas.

Our services listed but not limited to below:

Painting & Decorating
Laying laminate flooring
Construction of false walls and plaster-boarding
Garden & Landscaping projects

Another bathroom complete to a high standard. When I took the job on I didn't think it wud be a complete rip out. But no...
31/08/2024

Another bathroom complete to a high standard. When I took the job on I didn't think it wud be a complete rip out. But not sure on the company that fitted it. (It was through a grant). They left it half done. When they had a shower the water went everywhere. The shower screen wasn't securely fitted. This had been goin on since January.

Another kitchen completed.
29/07/2024

Another kitchen completed.

This week's job. Preparing a garden room so It can be skimmed. All done by daves property maintenance
26/07/2024

This week's job. Preparing a garden room so It can be skimmed. All done by daves property maintenance

this week's job. customer wanted new worktops, sink and metro tiles to finish it off.
17/05/2024

this week's job. customer wanted new worktops, sink and metro tiles to finish it off.

plaster all dry so went back to fit the skirting board. fit and plumbed the new radiator. job done.
09/05/2024

plaster all dry so went back to fit the skirting board. fit and plumbed the new radiator. job done.

06/05/2024
door way stubbed out and boarded up. both sides. bit of insulation in between. moved pipe work for a new radiator. went ...
01/05/2024

door way stubbed out and boarded up. both sides. bit of insulation in between. moved pipe work for a new radiator. went this evenin to skim both sides.
just need to go back to hang the radiator and put the skirting boards on.

after plastering the walls. customer wanted me back to add the skirting boards and decorate the full attic room
28/04/2024

after plastering the walls. customer wanted me back to add the skirting boards and decorate the full attic room

this bathroom was quite a challenge. felt like it took ages. 13 days in total. everything had to be ripped out, even the...
19/04/2024

this bathroom was quite a challenge. felt like it took ages. 13 days in total. everything had to be ripped out, even the plaster on the walls. ceiling had to be dropped and walls had to be dot n dabbed before any.tiling could be done. Well happy with the outcome tho. just the bath sides to put on then job done. another bathroom completed.

just finishing fitting this kitchen. I have been doing it on an evening. managed to finish it today.
13/04/2024

just finishing fitting this kitchen. I have been doing it on an evening. managed to finish it today.

all boarded. ceiling plastered and downlight lights fitted. can start putting some tiles on the wall tomorrow.
10/04/2024

all boarded. ceiling plastered and downlight lights fitted. can start putting some tiles on the wall tomorrow.

Address

Calderdale
Halifax

Telephone

+447875476312

Website

Alerts

Be the first to know and let us send you an email when Dave's property maintenance posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Dave's property maintenance:

Share