DC Rendering & EWI

DC Rendering & EWI Harrogate / Barnsley and surrounding areas
All aspects of rendering
Enquiries - [email protected]

freshen up on this gable 👏🏻 swipe for some close ups of the before➡️
04/09/2026

freshen up on this gable 👏🏻 swipe for some close ups of the before➡️

we love a nice big gable 🫧✨
31/08/2026

we love a nice big gable 🫧✨

swipe to see our work of art👏🏻Brick effect rendering is a multi step process to leave a “built like that” finish - preci...
23/08/2026

swipe to see our work of art👏🏻

Brick effect rendering is a multi step process to leave a “built like that” finish - precise measurements and keen eye for detail (if you spotted it, don’t worry! We go around once we’ve completed a panel and touch up any areas that need it😘)

Not just limited to red brick either, if you fancy a change - get in touch there are plenty of colours and finishes to choose from👏🏻

every brick carefully carved out, precise measurements calculated, to give the effect that the building was built this w...
18/08/2026

every brick carefully carved out, precise measurements calculated, to give the effect that the building was built this way🧱👏🏻

13/08/2026

Old failed system removed, fresh cement carrier boards applied ready for a refresh✨

Stay tuned to see how we do it with brick render🧱👏🏻

Nice little all around job completed this week💪🏻Fresh texture on the top half of this houseFresh texture on the gableBef...
08/08/2026

Nice little all around job completed this week💪🏻

Fresh texture on the top half of this house

Fresh texture on the gable

Before - water seeping through the external wall due to cracks and damaged render

Top complete, will be back at some point to silicone paint the rest of the externals to match the new texture🙌🏻

Damp inside due to damaged render externally and an incorrectly plastered loft space above following a chimney stack removal.

Old plaster removed on first floor, incorrect sand and cement removed from the loft and replaced with lime to allow the walls the breathe

Damp treatment solution applied

damp before

Internal plastering after 👏🏻

05/08/2026

satisfying texture rub up👋🏻

coming to an end on this job, straight onto the next one, next village over 👏🏻

Rend aid applied ✅Protection down ✅Ready for base coat ✅
04/08/2026

Rend aid applied ✅
Protection down ✅
Ready for base coat ✅

Recently upgraded Chads van signs, looking much smarter and more noticeable 👏🏻👏🏻signsdiy
01/08/2026

Recently upgraded Chads van signs, looking much smarter and more noticeable 👏🏻👏🏻

signsdiy

Address

Harrogate

Website

Alerts

Be the first to know and let us send you an email when DC Rendering & EWI posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category