Norfolk Quay Heading

Norfolk Quay Heading Norfolk Quay Heading are specialists in all types of timber quay heading

For all your quay heading needs, give us a call for a quotation on 01603 784 997
16/05/2024

For all your quay heading needs, give us a call for a quotation on 01603 784 997

It's been a busy start of the year. Just a few of the projects we have completed. Well done to Dan, Gareth, Ash and Max ...
01/04/2024

It's been a busy start of the year. Just a few of the projects we have completed.
Well done to Dan, Gareth, Ash and Max for all their hard work.
Roll on the warm weather and low tides.

Thank you to Andy Carpentor for taking a great photo on  one of our work barges on the way to Potter Heigham delivering ...
14/03/2024

Thank you to Andy Carpentor for taking a great photo on one of our work barges on the way to Potter Heigham delivering wood for another quay heading Job.

Another job completed replacing the quay heading and boardwalk. Not only to secure the land in place but also to help to...
03/02/2024

Another job completed replacing the quay heading and boardwalk. Not only to secure the land in place but also to help towards protecting the land against high tides.

If you are looking for your quay heading, boardwalks or land raised we Norfolk Quay Heading are here to help. We can dre...
24/01/2024

If you are looking for your quay heading, boardwalks or land raised we Norfolk Quay Heading are here to help. We can dredg your d**e and put the spoil on your land. Or alternatively we can deliver soil to your property by barge as well as raise the height of you quay heading and boardwalk.

Job completed in Wroxham this week. A waterside balcony. If you have got any quay heading or waterside construction need...
13/01/2024

Job completed in Wroxham this week. A waterside balcony.
If you have got any quay heading or waterside construction need doing, then give the office a call for an on site quotation
01603 784997

If you see us about in our new van, give us a beep!
10/01/2024

If you see us about in our new van, give us a beep!

Another job well done guys. This job required all the old quay heading being removed as in line with the work permit iss...
16/12/2023

Another job well done guys. This job required all the old quay heading being removed as in line with the work permit issued by the Broads Authority. Before the new quay heading could go in its place.
We also raised the land by almost a foot and Easy Property Maintenance will be laying the new turf as soon as the weather permits.

Even Dan (the boss) got his hands dirty on the tools on this one.
But it was a team effort with Gareth and Ash.

The guys love working out in all weathers and even more so as the early evenings set it. The guys least favourite part o...
29/11/2023

The guys love working out in all weathers and even more so as the early evenings set it.

The guys least favourite part of the job, removing the old quay heading. However, at least Gareth was nice and warm in the digger with the heater on. Poor Ash was out in the elements getting stuck in.

A quick stop off today on or way to Wroxham for our next job. We were asked to replace a mooring post that was broken by...
24/11/2023

A quick stop off today on or way to Wroxham for our next job. We were asked to replace a mooring post that was broken by a hire boat. The team installed a 6inch square 7.6 meter long pile. Due to the length of the pile it came with many challenges. And the wind and tide was also against us, but we got there. The post is now piled all the way in, and beyond.
Horning

With the recent flooding the Norfolk Quay heading team moored up all the equipment and swapped water for land. To design...
17/11/2023

With the recent flooding the Norfolk Quay heading team moored up all the equipment and swapped water for land.
To design and build this rather large decking area.
But they are back out in Horning on Monday on the river.
Well done guys, another happy customer!

Another great job done by our gents on the Broads Norfolk Quay Heading. 79 meters of quay heading, new frame work for th...
25/10/2023

Another great job done by our gents on the Broads Norfolk Quay Heading. 79 meters of quay heading, new frame work for the boardwalk and boarded. This job was particularly tricky at the end due to weather conditions, but they worked all the way through.

Now off to Horning with a little stop on the way for a quick repair job at Hoveton little broad.

Don't forget if you see us on the way to give us a wave.

Address

5B Folgate Road
North Walsham
NR280AJ

Opening Hours

Monday 9am - 5am
Tuesday 9am - 5am
Wednesday 9am - 5am
Thursday 9am - 5am
Friday 9am - 5am

Telephone

+441603784997

Alerts

Be the first to know and let us send you an email when Norfolk Quay Heading posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category