Finishing up at No. 8 with a very smart & traditional hallway!
Some significant repairs with a couple metres of Lath & plaster lost coming up the first flight of stairs that required immediate repair & a number of broken spindles were matched & replaced on the second flight also.
The walls were colour matched to the existing with the addition of a new colour scheme above & beneath the dado on the ground floor up. The newel posts, handrails & doors were stripped back entirely & stained/varnished/oiled accordingly thereafter for some added contrast.