02/03/2026
Tasked with reducing the size of the boxing in around some pipework. Somewhat restricted because concealing absolutely everything would have been incredibly intrusive to the fabric of the house, especially the way pipes were routed from the original house to the extension. At least some of the floorspace was recovered...