Our SmartGrid team wrapped up a critical site leveling and column position verification exercise for an ongoing structural development project.
Our objectives were:
-Establish a uniform site level to meet design gradients
-Verify and align column center points to engineering drawings
-Provide the contractor with as-built coordinates and a level report for the next construction stage
Using a combination of Total Station control, RTK GNSS, Automatic level and on-site benchmarks, we delivered a clean, consistent platform level and confirmed all column axes within allowable tolerances.
Great teamwork, precise ex*****on, and solid coordination with the site engineers made this a smooth operation. Always proud to see SmartGrid deliver accuracy where it matters most—at the foundation.