*_COST OF SAND FILLING YOUR PLOT_*
If you are building on a water logged plot, your foundation is likely to be a ‘raft’ foundation which shoots out of the ground instead of the strip foundation where the contractor digs into the earth.
In addition, to ensure that the site is well drained, the raft should be well above the road level and this means that the compound has to be filled with sand.
There are two types of materials used to fill the site: laterite earth filling (a reddish ‘sand’) which is usually transported from the Shagamu axis and sharp sand filling (a finer white sand) which is pumped from the lagoon bed.
The laterite earth filling costs an average of N15,000 per 10 ton tipper while the sharp sand filling costs an average of N45,000 per 20 ton tipper. The amount of sand required for sand-filling varies from site to site and is dependent on factors like size of the plot, height of the raft etc.
Typically for a private detached house on plot of about 600sqm, an average of 5 nos 20 tons tipper loads is about the quantity required.
As usual, our Layman Builder readers are advised to consult a quantity surveyor for the right measurements.