08/06/2026
EARTHQUAKE ADVISORY | Debris Cleaning and Safety Measures Ongoing
The Davao City Office of the City Building Official (OCBO) has completed its initial visual inspection of the affected areas within Verdon Parc. Initial observations were limited to non-structural cracks, damaged architectural finishes, and debris caused by the recent earthquake.
At present, debris clearing, housekeeping, and hazard mitigation activities are ongoing to ensure that affected areas are safe and ready for residents’ return. As these activities are still underway, residents are requested to remain in the designated assembly areas until further notice.
To support affected residents during this time, the Property Management Office (PMO) has provided food packs and drinking water while waiting for clearing and safety activities to be completed.
In accordance with OCBO recommendations, Verdon Parc will also undertake a formal Structural and Architectural Safety Assessment by qualified engineering professionals to further evaluate the condition, structural integrity, and safety of the affected building areas. The property likewise remains in close coordination with Structural Consultants, Design & Engineering (D&E), and relevant regulatory authorities for further assessment and recommendations.
We appreciate your patience, cooperation, and understanding as we complete the necessary safety measures. A follow-up advisory will be issued once clearing operations have been completed and additional guidance becomes available.