16/02/2025
The construction of the Panay-Guimaras-Negros (PGN) Link Bridge, a 32-kilometer infrastructure project, will begin this year, as confirmed by Mayor Jerry P. Treรฑas.
Estimated to cost โฑ189 billion, the PGN Link Bridge consists of two major sections.
Section A includes a 13-kilometer Panay-Guimaras segment, which includes a 4.97-kilometer sea-crossing bridge. On the other hand, Section B involves a 19.47-kilometer Guimaras-Negros segment, featuring a 13.11-kilometer sea-crossing bridge.
The bridge will span the challenging waters separating the islands of Panay, Guimaras, and Negros, requiring advanced engineering techniques and meticulous planning to address the complexities of the marine environment and terrain. | via Gerome Dalipe/PN