12/12/2025
Graveyard matter is the most pressing and serious issue at present. During the previous months of 2025, the Project Director unauthorizedly divided the designated mosque parking area into 5-marla residential plots, despite the fact that Fazaia Phase-1 Lahore predominantly comprises one-kanal residences (approximately 95%). This action is in direct violation of planning norms and has caused inconvenience to the residents.
Moreover, green park areas have been commercialized without provision of any parking facility, resulting in blockage of one side of the main road under the pretext of parking management. Additionally, construction on the Fazaia grid station commenced without any feasibility study or proper planning. The subsequent demolition of the structure and sale of equipment has caused a substantial financial loss amounting to millions of rupees, reflecting severe administrative negligence.
Despite numerous concerns already raised by residents, the most alarming and ongoing violation is the encroachment, construction, and illegal plotting within the graveyard land, which is not only unethical but also unacceptable to the community.
Fazaia Housing Scheme Raiwind Road Lahore Fazaia Housing Raiwind Road Lahore Pakistan Air Force