05/20/2025
Construction season has begun on Vicki, the Port Henry village victorian! On deck?
1. The walk in shower addition will finally be finished! Finshing the drywall, painting, installing crown moulding and the final finished millwork. Maybe even have the sink moved from the toilet grotto to it's home on custom vanity.
2. The living room will have the dead fireplace enclosed in a feature wall with hidden alcove. Al wood trim will have the edges broken and painted.
3. The pool room ceiling will be finished with rhe add on bathroom plumbing ceiling access built in. Crown and trim installed
4. The grill deck in the pool yard will have a roof and the serving/prep table till be upgraded.
STAY TUNED!