16/04/2026
This customer had been dealing with water running under his pole barn and washing the floor out for quite a while. To remedy this issue, we used sandy clay to raise the grade inside the structure approximately 3 inches. We then capped it with 10 tons of screened asphalt millings compacted at 3 inches thick to bring the total elevation change to 6”, eliminating the drainage issue and providing the customer with a solid base to store his equipment on.
We do a lot more than land clearing, folks! We offer solutions for a wide range of property needs, reach out today for your free on site consultation!