07/21/2026
Taking in the Lowcountry landscape before the next phase Kiawah River.
One of the first milestones in every build, this is the groundwork that everything else will stand on. Next up: footings and continuing structural framework, to anchor the home, followed by the concrete pour to lock the foundation into place.
More on this one as it unfolds.
-
Architect: DOMA Architecture
Designer: Tribus Interior Design