21/04/2026
FEC Constructions has reached a milestone on our Queen's Wharf Tower 5 & 6 Project with the Tower 5 perimeter screens installed.
These perimeter screens hang from the jumpform system and encapsulate 4 levels to allow our trades to safely undertake their works. This system will allow us to progress our structure in a timely and safe manner until we reach level 76. Keep an eye out for when the system climbs!
A big thank you to all our consultants and subcontractors who have contributed to reaching this milestone.