Tug Container Home

Tug Container Home “Trust and it will happen”

13/01/2026

Moving the container frames on to truck, to be moved down to new property 👌

Finally the day has arrived to start moving container frames for new build at our new property🤗Containers will be moved ...
11/01/2026

Finally the day has arrived to start moving container frames for new build at our new property🤗
Containers will be moved next week with a swing crane👌

09/01/2026

Whilst building the road got caught in mad storm, with hail rain lightning and thunder!!

Building the the access road in to the new property. Had a torrential rain storm with hail and lightning beginning of th...
09/01/2026

Building the the access road in to the new property. Had a torrential rain storm with hail and lightning beginning of this week but thankfully only small amounts of damage from flowing water down drive.
Got the road done yesterday to a point where we can now get trucks in. So will be bringing containers and frames on to site next week and the week after.
Getting really close to the start of the actual build on site, which will start with the screw piles to be installed. We had surveyor out to mark out house shed and studio a few weeks ago. So getting excited 🤗🤗
“Tug Container Home”

01/12/2025

Finally got permission and time to get rid of the eight trees at bottom of access road. All felled cut up and chipped in 3 hrs. Just got to go back and rip out stumps, then I can finish of road to house all 600m of it😳!!!

28/09/2025

Started to paint external roof of containers with Acrylic paint we did the inside and outside walls with. All done with a roller and hard work. Still got to do the 2nd coat and completely do the other five containers roofs on ground floor

Finally after a year of planning power poles arrived, one in the ground and two others lying on the ground ready for pow...
09/06/2025

Finally after a year of planning power poles arrived, one in the ground and two others lying on the ground ready for power outage date to be given.
Last year we were first told to get a right of easement for new lines and poles to run from main line to our property. The main line is on property across the road. I was then told things had changed and we did not need the owners to sign forms provided.
Just before Easter was given tentative date, 5 June 2025 and would be confirmed 2 weeks prior. No notification came through 2 weeks before. Then the Thursday the week before 5 June I received an email saying they now need the forms signed. So I sent email to neighbours requesting they sign the forms
The neighbours across the road have had their house up for sale for over a year. I did not receive a return email, so popped in today while visiting the property. They told me they couldn’t sign forms as have sold property and in the middle of settlement. Now we have to get new forms done and send to new neighbours once they move in, so maybe waiting another couple of months
This whole process was started in May 2024🥴

18/05/2025

The first part of the framing has started🤗

Started framing inside the containers, exciting 🤗
18/05/2025

Started framing inside the containers, exciting 🤗

01/05/2025

Laid containers out to mimick what the layout will be on site

Started to lay out containers how they will be on site, using Radiate Pine logs for temporary piers, then laying out con...
30/04/2025

Started to lay out containers how they will be on site, using Radiate Pine logs for temporary piers, then laying out container base frames, then containers on top. Unfortunately rain set in so this will have to wait till the rain stops 😉

Address