Problem solving at SOBRINA
Challenges are an inevitable part of the construction process.
At SOBRINA, the lower ground floor slab was raised by 300mm to achieve the required sewer fall, with no compromise to the interior spaces.
A simple adjustment, resolved through careful coordination on site.