29/04/2026
Today we embarked probably on one of the most difficult Engineering feats to construct and put together On Site but we prevailed , and we got it done again .
Steel framework for the counter lever balcony started off with 11.5 meter 200 UB beam weighing in at 2.3 t , welded and bolted together perfectly 15 meters up from the ground.
Engineered and designed to withstand the balcony counter lever beams and deflection properties of the N3 high wind classification.
The 5 degree Roof pitch with 1m  radiuses bent perfectly  on the front PFC Facia beam , follows the contours of the concrete balconies below.
Total tonnage of Steel erected today 7.8 t 
One word
Perfection!!!