ARK Houses

Directions Website Contact the business

ARK Houses Licensed NSW Residential Builder | Houses • Dual Key • Duplexes • Renovations • Builder Recovery • HBCF Insurance Documentation Support | Phone 0495 007 755

There's one bank transfer I wish I could undo.My wife told me not to make it.I made it anyway.We were building a duplex ...
09/10/2026

There's one bank transfer I wish I could undo.

My wife told me not to make it.

I made it anyway.

We were building a duplex in Cameron Park.

Two homes on one block, both intended to be rented out.

We'd signed the contract, made the progress payments and watched the buildings go up.

The roof was on. Windows and doors were installed.

From the street, everything looked pretty good.

I even sent a photo to a mate.

"Nearly there."

I wish that had been true.

The delays started gradually.

One week the builder was waiting for materials. Another week the trades were busy elsewhere.

I'd ring to ask when the next stage would be finished.

"Should be next week, mate."

Then next week would arrive, and I'd be ringing again.

Sometimes I'd drive past the site and there wouldn't be anyone working.

Meanwhile, the bank was charging interest on our construction loan.

We'd budgeted for that during the build.

But every extra month meant another interest payment and another month without rent from either house.

Then the builder told us he needed more money.

Labour and materials had become more expensive, he said.

He couldn't finish the duplex for the original contract price.

I pulled out our contract.

We hadn't changed the plans or asked for upgrades.

I couldn't understand why we were being asked to pay more for exactly what we'd already agreed to.

My wife said we shouldn't pay another cent.

I agreed with her about the contract.

But the houses were around lock-up stage. There was still a huge amount to finish inside.

I kept thinking about what would happen if the builder stopped working.

We'd have two unfinished houses, no rent and a construction loan that still needed paying.

So I made the transfer.

I saved the receipt and asked the builder when we could expect the remaining work to be completed.

He gave me another estimate.

The delays continued.

I'd visit the site, ring for updates and try to work out when we could finally advertise the properties for rent.

Then the builder told me he'd lost his building licence.

His company was going into liquidation.

He couldn't finish our duplex.

I asked what we were supposed to do.

He said we'd need another builder.

I rang my wife.

"He's not finishing the houses."

"What do you mean?"

"He's lost his licence."

She asked about the extra money we'd paid.

I didn't have an answer.

I went back to the site.

Two buildings standing there, both locked up, both still needing substantial work.

We'd already paid so much money.

And now we didn't even have a builder.

I started ringing builders around Newcastle and the Central Coast.

As soon as I mentioned that the original builder had gone into liquidation, the answer was usually the same.

"Sorry, mate. We don't take over other builders' work."

I tried company after company.

Nobody wanted it.

One builder said he wasn't prepared to take responsibility for work he hadn't done himself.

I understood his point.

But we still had two unfinished houses and a loan to repay.

Around then, I noticed dark patches on the Hebel cladding.

I walked closer.

Mould.

On brand-new houses that nobody had ever lived in.

I took photos and sent them to my wife.

"Is that mould?"

"Looks like it."

"On our new houses?"

"Yep."

I didn't even know who was supposed to deal with it.

We had HBCF insurance and had already arranged a Dilapidation Report.

But the claim wasn't sorted out, and we still needed someone to finish the duplex.

Eventually, I posted in a local Facebook group.

"Can anyone recommend a licensed builder willing to finish an incomplete duplex in Cameron Park? Original builder has gone into liquidation. Everyone I've contacted has turned it down."

A few people suggested Fair Trading.

Someone recommended a solicitor.

Then somebody gave me the name of a builder who was taking over unfinished projects.

I sent them a message with some photos.

They asked for the contract and plans, then agreed to inspect the duplex.

I was relieved just to find someone willing to look at it.

They walked through both homes, checked the existing work and prepared a plan for completing the construction.

Then I saw the cost.

I knew finishing two houses wasn't going to be cheap.

But we simply didn't have that kind of money.

We'd already paid the original builder, including the extra amount he'd demanded.

Now we needed a substantial sum all over again.

I went through our accounts.

There wasn't some forgotten savings account with enough money to cover it.

We'd already used money we'd intended to keep aside.

And the construction loan was still costing us interest every month.

We started borrowing.

I hated having to ask people for money.

We'd started this project because we wanted two investment properties.

Now we were borrowing money just to finish houses we'd already paid someone to build.

But leaving them unfinished wouldn't make the debt disappear.

Eventually, we scraped together enough to get construction moving.

The new builder started work.

Trades returned to the site.

Materials arrived.

For the first time in ages, I could drive past and actually see progress.

But the money was disappearing faster than we'd hoped.

We'd already arranged the Dilapidation Report for our HBCF claim, but the financial information still needed to be submitted correctly.

Later, while construction was underway, the new builder helped us get that part sorted out.

The insurer eventually approved and paid the incomplete works component.

I checked the payment against what we were actually spending to finish the duplex.

It wasn't even close.

The payout covered only a small part of the completion cost.

Most of the money still had to come from us.

And then another problem appeared.

The new builder found a defect in work the original builder had already completed.

It needed to be corrected before construction could continue.

I asked how much it would cost.

Another invoice.

For work we'd already paid for once.

We paid it.

Then another defect was discovered.

Some problems hadn't been visible during the initial inspection. They only became apparent as the remaining construction progressed.

Each time, the builder documented what was wrong and what needed to be done.

And each time, we had to find the money.

We'd already borrowed to cover the enormous gap between the insurance payout and the actual cost of finishing the duplex.

Now we were paying to correct the original builder's mistakes as well.

I started keeping the defect invoices in a separate folder.

Photos. Descriptions. Receipts.

The HBCF claim was still open, but we couldn't finalise the defect costs until the houses were finished and we knew what else might be uncovered.

So we paid for the repairs as they came up.

The builder documented everything.

And the work continued.

The kitchens were installed.

The bathrooms were completed.

The remaining construction was finished.

Eventually, both homes were ready.

I walked through the duplex.

Everything looked the way it should have looked a long time ago.

But I couldn't look at the finished rooms without thinking about how much money we'd spent getting them there.

And how much of it we'd borrowed.

After completion, the builder helped us put together the documentation for all the defect rectification work we'd paid for.

Those expenses were submitted under the same HBCF claim we'd kept open.

The insurer had already paid the incomplete works component earlier.

Now it reviewed the costs of correcting the original builder's defective work.

Those costs were approved.

We were reimbursed for the rectification expenses.

That was a huge relief.

But it didn't make the project financially worthwhile.

The incomplete works payout hadn't come close to covering the actual cost of finishing the houses.

We'd borrowed money to make up the difference.

We'd paid construction loan interest throughout the delays.

We'd missed out on rent from both properties.

And we'd made that extra payment to the original builder before he lost his licence.

Even after the defect reimbursement, the total cost was enormous.

Far more than we'd ever planned to spend.

We finally advertised both homes for rent.

Both found tenants.

I remember seeing the first rental payment arrive.

After so long watching money leave our account, it was strange seeing some come back in.

But the numbers were awful.

The rent couldn't make up for what the project had cost us.

We still had debts to deal with.

As an investment, the duplex had turned into a financial disaster.

Both homes are rented now.

The construction is finished.

There are no more trades to chase, no more unfinished rooms and no more calls asking us to pay for another repair.

We still have the financial consequences to deal with.

But at least the building nightmare is over.

I still think about that bank transfer.

The extra money I paid because I was afraid the original builder would stop work if I refused.

He stopped anyway.

The company that eventually took over and finished our duplex was Ark Houses.

They completed seven unfinished projects from the same failed builder, including ours.

I'm grateful somebody was willing to take it on when nobody else would.

I'm relieved the houses are finished. I'm grateful they're rented. And I'm grateful the nightmare eventually ended.

(a Cameron Park homeowner's story)

04/10/2026
Subdivision can give a duplex owner much more flexibility than simply having two dwellings on one property.Once separate...
18/08/2026

Subdivision can give a duplex owner much more flexibility than simply having two dwellings on one property.

Once separate titles are created, each side can potentially be sold independently. It may also improve refinancing opportunities if the completed subdivision results in a higher valuation and additional usable equity.

Separate titles can also open the property to a wider buyer market and give owners more options to sell one dwelling, keep the other as an investment, reduce debt or restructure their portfolio in the future.

Our latest article explains why subdivision can be an important part of a duplex strategy, how it may affect resale and refinancing, and why it should be considered from the beginning of the project.

Read the full article below.

ARK Houses. Local. Reliable. Professional.

https://arkhouses.com.au/blog/why-subdivision-matters-building-duplex.html

LEICHHARDT HOME RENOVATION | THE RESULT FOR THE OWNERSLocation: Leichhardt, NSWThe former bathroom and separate WC have ...
18/08/2026

LEICHHARDT HOME RENOVATION | THE RESULT FOR THE OWNERS

Location: Leichhardt, NSW

The former bathroom and separate WC have become one stylish, modern room that feels considerably larger.

Removing the dividing wall recovered space previously occupied by the partition, second doorway and restricted circulation areas. Taking out the bath provided more standing room and allowed the available floor area to be used for a more generous shower. The repositioned vanity creates a clearer path between the fixtures and improves movement through the room. A single continuous floor also means fewer thresholds, jambs and tight corners to clean.

WOONGARRAH DUPLEX DEVELOPMENT | SUBDIVISION COMPLETELocation: Woongarrah, NSWCompleted scope: Duplex construction and su...
18/08/2026

WOONGARRAH DUPLEX DEVELOPMENT | SUBDIVISION COMPLETE
Location: Woongarrah, NSW
Completed scope: Duplex construction and subsequent subdivision into two individual lots
The subdivision of our completed Woongarrah duplex is now complete.
The original development now consists of two individual lots, with one self-contained residence positioned on each.
The building work proceeded under its CDC, while the subdivision followed a separate documentation, certification and registration process.
This final step brings together the planning that has guided the project from the beginning. The building layout, garages, vehicle access, private outdoor areas, drainage and site works were all coordinated to support the intended lot arrangement.
Separate service provisions for water, sewer, stormwater, electricity and communications were also incorporated for the two residences. Additional inspections, certificates, authority requirements and supporting documents were completed as the construction and subdivision processes progressed.
Congratulations to our clients on completing the final stage of their Woongarrah development.
Planning a duplex development or future subdivision? Send us a message to discuss your project.

Is a double vanity worth including in your master ensuite?A second basin can make the space more practical for two peopl...
17/08/2026

Is a double vanity worth including in your master ensuite?

A second basin can make the space more practical for two people, but only when the vanity is planned properly. Limited benchtop space, insufficient storage, poor lighting, awkward plumbing or inadequate clearance can make a larger vanity less functional than expected.

In our latest article, we explain what to consider when planning a double vanity and how the right layout can improve the everyday use of a master ensuite.

Read the full article below.

ARK Houses. Local. Reliable. Professional.

https://arkhouses.com.au/blog/double-vanity-master-ensuite.html

A backyard gate is one of those details that’s easy to overlook when planning a new home.But later, when you need to mov...
17/08/2026

A backyard gate is one of those details that’s easy to overlook when planning a new home.
But later, when you need to move a large fridge, outdoor furniture, landscaping equipment or building materials into the backyard, a narrow side gate can become a surprisingly big problem.
At ARK Houses, we look at practical details like this as part of the overall design, including the actual clear gate opening, side access, services, pathways and how bulky items will move through the property.
If you’re building, it’s worth checking these things before the plans are finalised. A little extra thought now can save a lot of inconvenience later.

We’ve put together a practical guide on what to consider when choosing your backyard or side gate width:
https://arkhouses.com.au/blog/how-wide-should-backyard-gate-be.html

LEICHHARDT HOME RENOVATION | PROJECT COMPLETELocation: Leichhardt, NSWCompleted scope: Main bathroom and adjoining WC co...
17/08/2026

LEICHHARDT HOME RENOVATION | PROJECT COMPLETE
Location: Leichhardt, NSW
Completed scope: Main bathroom and adjoining WC combined into one room
Our Leichhardt home renovation is complete.
The original bathroom and separate WC are now one cohesive and practical space.
The finished bathroom combines full-height large-format marble-look wall tiles with charcoal floor tiles and matt-black fittings.
A white corner bath sits beneath the frosted windows, with a recessed niche providing convenient storage. The new frameless glass shower includes overhead and hand showers together with a second recessed niche.
A dark wall-hung vanity with a white benchtop and countertop basin provides generous storage, complemented by a recessed mirrored shaving cabinet.
The bathroom is completed with a back-to-wall toilet, heated towel rail, new downlights and coordinated accessories.
Thank you to our clients in Leichhardt for trusting us with their renovation.
Planning a bathroom renovation in NSW? Send us a message to discuss your project.

HORNSBY HEIGHTS ENSUITE RENOVATION | PROJECT COMPLETEA compact ground-floor ensuite, thoughtfully rebuilt.This Hornsby H...
15/08/2026

HORNSBY HEIGHTS ENSUITE RENOVATION | PROJECT COMPLETE
A compact ground-floor ensuite, thoughtfully rebuilt.
This Hornsby Heights ensuite was stripped back and renovated with new wet-area wall linings, waterproofing, full-height tiling, plumbing alterations, carpentry and plastering, followed by fresh paintwork.
The completed space features a frameless glass shower with an overhead shower and handheld rail, a recessed niche, a concealed-cistern toilet, a wall-hung vanity with vessel basin and a recessed mirrored shaving cabinet.
Large-format grey tiles are paired with smaller-format feature tiles to add subtle contrast and texture. Coordinated fittings and a carefully planned layout make practical use of the compact space while creating a clean, cohesive finish.
Thank you to our clients in Hornsby Heights for trusting us with their ensuite renovation.
Planning a bathroom or ensuite renovation? Send us a message to discuss your project.

Address

Mount Low
Townsville, QLD
4818

Alerts

Be the first to know and let us send you an email when ARK Houses posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ARK Houses:

Shortcuts

Share