21/02/2024
A Semi-Detached residential building was recently completed at Eastwood.
FES were engaged from the building set-out stage onwards.
A Work As Executed has recently been carried out over the drainage system components within the properties together with an Identification Survey as part of the requirements to obtain an occupation certificate.
FES prepared a two lot Strata plan suitable for lodgement at LRS.