16/04/2021
The Bridge over the Samur River will replace the previously existing, built in 1953-1957 and put into operation in 1957 as part of the Samur hydroelectric complex, and will reduce holdups. After the commissioning of the new bridge, the old one will be closed for traffic, and will function as a service bridge for the operation of the hydraulic system, because it does not meet modern standards and requirements.
______________
SMM by .biz