09/19/2024
Brand new custom unit, demolished floor to ceiling & wall to wall opened up concrete to concrete.
Zero asbestos in the unit, air quality test obtained from
EMSL Canada Inc.
All the gaps around the pipes filled with spray foam.
Brand new electrical wiring & panel, water pipes & new valves plumbing entire unit.
Brand new framing & drywalls.
Hardwood floors, 6 x custom closets all has custom organizers (3 x walk in closet), largest possible tiles, built-in & floating shelfs & cabinets in kitchen, bathroom, family room.
Full Jenn Air kitchen appliances set including 2 x panel ready wine fridges right hand swing & left hand swing, each with 2 different zones & with sensor lights, panel ready 36” counter depth bottom freezer fridge, microwave & wall oven set, panel ready dishwasher, hood & Bosh Benchmark cooktop (for amp calculation), Electrolux full size washer & dryer tower. All brand new appliances with their full guarantees & warranties. Bonus pot filler also added.
All quartz & dekton (from Spain) countertop’s & backsplash’s, in the kitchen & bathrooms, floors, in front of all windows.
Every room carbon & smoke detectors.
Lot’s of high-end expensive materials, hungers, led light anti fog mirrors, faucets, Versace 24K Gold Plated door handle on entry closet, Sony 75” tv sound bar, subwoofer.
Planks on living room wall, wood accent walls in bedrooms.
Custom motorized zebra blinds in every room.
Dropped ceiling, one smooth level entire unit & dimming potlights, no bulkhead or any irregular spots.
Wood crown mouldings, trims, baseboards, custom frames entire unit.
New thermostats.
Flower pots, Muskoka chairs, exterior plug in balcony.
& +++.
General contractor is team of 5,
Floor tiling team of 2,
Kitchen cabinets team of 4 ,
Appliance’s installers form the company I purchased Goemans team of 2,
Kitchen & Bathrooms countertops & backsplashes & window fronts team of 2,
Electrician team of 3,
Plumbing 1 individual,
Type & Paint team of 3,
Custom closets team of 2 by California Closets,
Custom glasses 1 individual,
More than 30 people worked in the unit
& also Werek company did the all demolition part from the building those are large team additional..