05/25/2021
Core slab was delivered on Friday and hoisted into place to form the ceiling of our walkout Level A and the floor of Level B just in time for the long weekend.
Construction and condo sales are moving along quickly on the shores of Georgian Bay in Parry Sound.
Call (705)778-8833 or visit our website to register for details and a meeting.
www.thelighthousegeorgianbay.ca
Gerrits Drilling & Engineering