The Valley Retreat a new glamping experience in Sharbot Lake, On.

the cabin is the first build we started on this project. the building serves as a main hub for services to the domes but...
10/05/2026

the cabin is the first build we started on this project. the building serves as a main hub for services to the domes but will also be accommodations.

we were juggling a hydro service relocate and upgrade while framing, sheathing, and roofing in the snow. once it was hooked up to hydro and closed in, things came together 👌

the domes have their skylights, the hot tubs are in, the nights are getting crisp and perfect to relax by the fire and s...
10/02/2026

the domes have their skylights, the hot tubs are in, the nights are getting crisp and perfect to relax by the fire and see the stars. DM us to stay with us and you’ll be the first to know when bookings open!

09/22/2026

A quick update after Summer! We can’t wait to start sharing our space with you!

Big day for us as we installed our skylightsđŸ™ŒđŸ»â˜€ïž we pushed this off for far too long but managed to get it done with a 2...
09/17/2026

Big day for us as we installed our skylightsđŸ™ŒđŸ»â˜€ïž we pushed this off for far too long but managed to get it done with a 2 man crewđŸ’Ș

No marriages were harmed in the makingđŸ€Ł

Kinda chic is the dream before it’s finished.The plans.The mess.The late nights.The unexpected expenses. 😅The time away ...
08/15/2026

Kinda chic is the dream before it’s finished.

The plans.
The mess.
The late nights.
The unexpected expenses. 😅
The time away from our family.

There’s a lot that happens before the pretty pictures.

But watching an idea become a place, a business and eventually a life
 makes every challenging step worth it.

A quick update on how July went at The Valley Retreat!- domes were fully secured to their platforms- entrance doors were...
08/05/2026

A quick update on how July went at The Valley Retreat!

- domes were fully secured to their platforms
- entrance doors were installed on domes
- insulation installed in domes
- trenches for septic lines (lots of breaking rock!!)
- septic lines were installed
- interior framing completed in both domes
- plumbing installed in both domes
- water lines trenched
- cabin had epoxy and clear coat on floor
- cabin bathroom fully plumbed/ hooked up
- cabin siding install finished

We’re starting to see the light at the end of the tunnel, we can’t wait to start sharing this space with you! Until then, feel free to reach out, say hi, ask questions, we love hearing from you!

Siding is being installed on the cabin this week. We love the modern Scandinavian look that’s coming out in this!An over...
06/19/2026

Siding is being installed on the cabin this week. We love the modern Scandinavian look that’s coming out in this!

An overhead view of The Valley Retreat! Each unit is private, with a separate area to take in the serenity of the forest!

Take in a beautiful forest view from a king size bed in our domes! Heated floors and a heat pump/AC to keep you comfortable no matter what the season is! Each unit also has a loft with a stargazer queen bed, meaning you can sleep up to 4 adults comfortably in each dome. Running water, full bathrooms with a proper functioning toilet and a kitchenette for cooking inside means you don’t have to sacrifice modern amenities to enjoy the wilderness!

On top of all that, each dome unit will have a private hot tub with a peaceful view of the forest! Just you, the birds chirping and the wind rustling the leaves

It’s been just over a year of owning the property where we are building The Valley Retreat! Swipe through for a look at ...
06/02/2026

It’s been just over a year of owning the property where we are building The Valley Retreat! Swipe through for a look at the transformation over the last year!

WE DID IT!!! So thankful for our amazing crew of family and friends who helped us put up two dome frames in 1.5 daysđŸ’Ș (a...
06/01/2026

WE DID IT!!! So thankful for our amazing crew of family and friends who helped us put up two dome frames in 1.5 daysđŸ’Ș (and the grandmas who helped watch the kids!)

Our vision is really starting to come together and we can’t wait for the next steps on this journey😍✹

Stay tuned!!

It was a busy week at The Valley Retreat! - concrete slabs with in-floor heating got poured- made a retaining wall at th...
05/24/2026

It was a busy week at The Valley Retreat!
- concrete slabs with in-floor heating got poured
- made a retaining wall at the front entrance
- got our new sign
- spruced up the ladder loft in the cabin, put railings on it and extra structural screws in the steps
- got the shower put together and the vanity in and assembled

Address

Sharbot Lake, ON

Website

Alerts

Be the first to know and let us send you an email when The Valley Retreat posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to The Valley Retreat:

Shortcuts

Share

Category