Sanyc Ingenieria

Llamar Cómo llegar Página web Contactar con la empresa

Sanyc Ingenieria Desing, permits and construction all under one roof

31/08/2026

Every good design starts underground. 🏗️
▎
▎ Before we touch a blueprint, our team runs a full site analysis: drone topographic survey, GPS control, geotechnical borings, and slope stability analysis — checked against Costa Rica's seismic code. That's how we know exactly what this land can hold, and exactly how to shape it.
▎
▎ This site becomes a small boutique hotel on the upper platform, with private villas and a tennis court further down the property — real cuts, real retaining work, real progress happening this week.
▎
▎ 📍 Playa Potrero, Guanacaste
▎ 🏗️ Sanyc Ingeniería — from site study to finished design.
▎ 🔗 http://www.sanycingenieriacr.com
▎
▎
▎
▎ 👉 Follow to watch this site become the design.

18/08/2026

This is it — the reveal. 🏡✨

Same villa. Same pool. From scaffolding… to this. From rebar and dirt… to this.

Step inside and every space delivers: a kitchen built for real living, bedrooms that wake up to the ocean, marble counters and hand-finished teak in every bathroom, walk-in closets finished top to bottom — and outside, an infinity pool built to disappear into the horizon.

This is Part 3 — the final look at our finished Punta Islita project. Three posts, one build, zero shortcuts: because at Sanyc, we show you the whole process, not just the after.

📍 Punta Islita, Guanacaste
🏗️ Sanyc Ingeniería — from land selection to final walkthrough.
🔗 http://www.sanycingenieriacr.com



👉 Follow — this is what "done right" looks like, and we're sharing real projects like this every week.

11/08/2026

Why are we doing this? Because we’ve seen it all: people buying in zones where you legally can’t build, land with no real water or power access, and serious issues from not understanding the Maritime Terrestrial Zone. We want to be that transparent, trustworthy guide from day one.

👇 You choose the next topic:
1️⃣ Zoning rules and their limits
2️⃣ What studies you need before building

Drop your number and we’ll cover it in the next video.

📍 Sanyc Ingeniería — from land selection to final walkthrough.
🔗 www.sanycingenieriacr.com

11/08/2026

🤖🏗️ Yes, it’s an AI. But it knows Costa Rica inside and out — zone by zone, coast to mountain.

Meet the start of our new series: Ask Sanyc. Video by video, we’re tackling the questions foreigners actually have when buying land or building in Costa Rica — permits, zoning, technical studies, and everything nobody explains before you sign.

Why are we doing this? Because we’ve seen it all: people buying in zones where you legally can’t build, land with no real water or power access, and serious issues from not understanding the Maritime Terrestrial Zone. We want to be that transparent, trustworthy guide from day one.

👇 You choose the next topic:
1️⃣ Zoning rules and their limits
2️⃣ What studies you need before building

Drop your number and we’ll cover it in the next video.

📍 Sanyc Ingeniería — from land selection to final walkthrough.
🔗 www.sanycingenieriacr.com

08/08/2026

Dirección

Guanacaste
Santa Cruz

Notificaciones

Sea el primero en enterarse: le enviaremos un correo electrónico cuando Sanyc Ingenieria publique novedades y promociones. Su dirección de correo electrónico no se utilizará para ningún otro fin y puede darse de baja en cualquier momento.

Contactar Con La Empresa

Enviar un mensaje a Sanyc Ingenieria:

Atajos

Compartir