Lamdavisiontower

Lamdavisiontower A high quality building located in the most commercial road of Nicosia -Right on Limassol Avenue. Large office floors to let

20/09/2025
Renovation of the ground floor showroom into energy efficient offices has been completed and ready for the tenant to mov...
26/04/2023

Renovation of the ground floor showroom into energy efficient offices has been completed and ready for the tenant to move in . 3 heat recovery systems are in operation and newly installed access control, burglar alarm and fire alarm 🚨

Renovation work continues and it’s within a few days of completion .New fresh air system with heat recovery, Mitsubishi ...
30/03/2023

Renovation work continues and it’s within a few days of completion .

New fresh air system with heat recovery, Mitsubishi airconditioning equipment , Phillips LED lights, access control, burglar and fire alarm and network access points.

In an effort to reduce the waste footprint of LamdaVision Tower building,  a paper recycling bin and a PMD recycling bin...
19/03/2023

In an effort to reduce the waste footprint of LamdaVision Tower building, a paper recycling bin and a PMD recycling bin have been introduced to the building for the sole use of the tenants.

Tenants can thus reduce the running cost of their waste as in Aglantzia Municipality you pay garbage fees according to the number of pink garbage bags you use.

Renovation work is underway to convert the ground floor showroom and mezzanine floor into partitioned and high quality o...
07/03/2023

Renovation work is underway to convert the ground floor showroom and mezzanine floor into partitioned and high quality offices. New network points, airconditioning system and fresh air system with heat recovery will be installed with a 6 weeks completion timeframe.

26/08/2021

One of the 3 photovoltaic systems installed at Lamdavision tower. In 8 months of operation 11 tons! of CO2 emissions were saved and its like the equivalent of 150 trees planted!

See more details at the monitoring site

In view of the uprising number of COVID19 cases, automatic sanitising devises have been installed in the lift lobby’s of...
22/10/2020

In view of the uprising number of COVID19 cases, automatic sanitising devises have been installed in the lift lobby’s of the basement and ground floor and in the lift lobby of each office floor.

3 photovoltaic solar systems have been installed on LamdaVision roof totaling 22Kw. A production of 35.000Kwh of electri...
21/09/2020

3 photovoltaic solar systems have been installed on LamdaVision roof totaling 22Kw. A production of 35.000Kwh of electricity is expected to be produced/saved annually which is roughly the equivalent of:

a) getting 5.4 cars off the road
b) the total annual energy of 5 houses
c) a forest of 412 trees or 110.000m2 of forest and
many more ecological benefits ...

The Roll-cage barrier protects the basement and opens up through access control only for the building tenants. One of th...
12/09/2020

The Roll-cage barrier protects the basement and opens up through access control only for the building tenants.

One of the many safety features of LamdaVision Tower.🏪🔑

Parking lines have been painted on the ground floor parking area to make parking easier for the building tenants.
08/08/2020

Parking lines have been painted on the ground floor parking area to make parking easier for the building tenants.

Address

Leoforos Lemesou 67
Nicosia
2121

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00

Telephone

+35799270635

Website

Alerts

Be the first to know and let us send you an email when Lamdavisiontower posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category