13/09/2022
When carrying out non-destructive testing the importance of system verification is a fundamental stage in any NDT process. There are a multitude of factors that can affect any NDT process from surface condition, surface temperature, variation of material thickness, family of consumables etc.
With our technician's attending any project you can be assured that all the necessary steps are taken to prove the systems are functioning properly prior to carrying out any inspections with utilising equipment such as these listed:-
- Foil Strips / Slotted shims
- Pie Gauge Penetrameter
- Gauss Meter
- Tam Panel
- Flawed Specimen
- Reference Blocks
- Dual light meters
- Test weights
With the above items being an industry standard, and as stated within the company NDT Procedures ‘shall’ be administered at the beginning stages of any NDT task and importantly, there are times where client specific validations are required. We at STAG TIC, have the pleasure of working closely on many occasions with our NDT Level III provider Array Training Limited where they constantly draft/review or endorse current industry NDT procedures including bespoke procedures for the ex*****on of relevant NDT inspections. Where required by the client, at request our NDT Level III will attend work site(s) along with STAG TIC management to validate necessary Inspection processes.
Contact STAG TIC today to see how we can support and have that peace of mind that experienced and qualified technician's will be carrying out your NDT work projects in the upmost professional manner.