Large lounge in Bangor decorated this week. 🎨 Full breakdown on what actually needs doing (in my opinion)
Day one and most of day two were spent stripping the paper from the ceilings and walls. A full sand of all walls and ceilings was then carried out, followed by the first fill to countless holes and imperfections.
Large cracks were raked out and decorators’ scrim was adhered over them before filling, helping to prevent them from coming back.
Day 3 was spent sanding the previous day’s filler, followed by a second fill to smooth everything out. It was then back on the sander with a 240-grit mesh pad.
All wall and ceiling joints were caulked to close up any gaps, getting everything ready for a full coat of Zinsser Gardz to seal the ceilings and walls.
Day 4 was another sanding day, this time concentrating on the woodwork. This was followed by caulking and, once dry, Johnstone’s Aqua Guard Undercoat/Primer.
The woodwork was then finished with 2 top coats of Johnstone’s Aqua Guard Durable Satin.
All of this was carried out alongside 3 top coats to the ceilings.
Day 5 was all about getting the walls finished, along with any last little bits of filling that had been missed.
A massive thank you to Tasha and Nick for putting up with the mess, allowing me to leave everything set up overnight, and for all the tea! ☕😂
That’s another one finished. Back in a week to start the hall, stairs and landing. 😁
All in the preparation don't settle for less