M P Properties Limited

M P Properties Limited Property developers
All aspects of commercial and domestic building work carried out

Specialists in:

Exterior+Interior Decoration
Electrical Work Commercial & Domestic
Boiler Repairs
Plumbing
Bathroom+Kitchen Fitting
Steel Beam Calculations
Roofing
General Building
Joinery
Flooring
Steel Fabrication
Domestic appliance repairs

Plumbing work on commercial premises. Extension of water main to provide cellar with water supply. Main was tapped into ...
29/09/2023

Plumbing work on commercial premises. Extension of water main to provide cellar with water supply. Main was tapped into using a reducing tee fitting. It was a rigid system with no play so a section was cut out, the tee piece made to length then installed using soldered slip fittings.

11 year old Bush front loading washing machine causing electrics to trip at Consumer Unit. Suspected water leak or earth...
27/08/2023

11 year old Bush front loading washing machine causing electrics to trip at Consumer Unit.

Suspected water leak or earth leakage causing this fault. Top cover removed and no sign of water leaking onto electrics. Suppressor tested for designated resistance ohm reading which was fine. Motor inspected. Signs of serious carbon build up caused by carbon brush wear. Motor removed and tested which showed an earth leakage.

To fit a new motor was not economically viable so we stripped the motor down and cleaned coils and commutator with contact cleaner then re-assembled and re-tested. Earth leakage fault now not present. Carbon dust therefore causing earth leakage as originally suspected. This in turn will cause a current surge in the motor leading to tripping of main electrics.

Washing machine re-assembled and tested. It now runs fine without causing main electrics to trip.

(Note: This could also have been the inlet valve or heating element however these were ruled out by the fact problem was present on the spin cycle.)

Great way to spend a Sunday!

Heavy duty anthracite contract carpet installed on three floors of commercial premises including three stairwells. Iron ...
05/08/2023

Heavy duty anthracite contract carpet installed on three floors of commercial premises including three stairwells. Iron carpet grippers and nosings manufactured and installed by us to specification.

July 2023.Storage unit with mortice lockable door fitted in commercial premises.
26/07/2023

July 2023.

Storage unit with mortice lockable door fitted in commercial premises.

July 2023.Concrete steps and coping stones porous causing damp in cellar. Painted with Blackjack DPM paint to seal and c...
26/07/2023

July 2023.

Concrete steps and coping stones porous causing damp in cellar. Painted with Blackjack DPM paint to seal and cellar dried out with heater and dehumidifier.

December 2022.July 2023.Leaks on pitched roof valley. Rotten mortar chased out and replaced with bed of fresh mortar mix...
26/07/2023

December 2022.
July 2023.

Leaks on pitched roof valley. Rotten mortar chased out and replaced with bed of fresh mortar mixed with SBR.

April 2023.Pruning of trees at rear of commercial premises and removal of brush using cherrypicker and chainsaws.
25/07/2023

April 2023.

Pruning of trees at rear of commercial premises and removal of brush using cherrypicker and chainsaws.

April 2023.Gutter leak at interface with adjoining property. Not able to gain full access to remove and replace connecto...
25/07/2023

April 2023.

Gutter leak at interface with adjoining property. Not able to gain full access to remove and replace connector so CT1 mastic was applied to make repair.

March 2023.Ideal Logic Combi 24 gas boiler intermittent F2 fault and not igniting.Condensate trap and pipe checked for b...
25/07/2023

March 2023.

Ideal Logic Combi 24 gas boiler intermittent F2 fault and not igniting.

Condensate trap and pipe checked for blockages.
PCB power to gas valve, igniter and electrodes tested with multi-meter.
Gas supply ON position checked.
Gas valve tested with monometer.
Spark generator/igniter unit replaced along with ignition and flame detection electrodes.

Boiler re-set. F2 fault and intermittent problem now gone.

February/March 2023.Removal of first floor internal wall as part of existing dormer shell extension and siting of univer...
25/07/2023

February/March 2023.

Removal of first floor internal wall as part of existing dormer shell extension and siting of universal beam ready for installation. Universal beam was carried manually to rear of property and hoisted up with a winch pulley system.

Address

65-69 Old Chester Road
Birkenhead
CH419AW

Website

Alerts

Be the first to know and let us send you an email when M P Properties Limited posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share