Lands Lane Development A page to share the story of the ongoing work at 3 Lands Lane, Eccleshill, BD10 8AB

Gable end nearly down and external stones neatly pilled in their sizes.
27/05/2023

Gable end nearly down and external stones neatly pilled in their sizes.

Finally the gable end is being deconstructed.
18/05/2023

Finally the gable end is being deconstructed.

We have been shoring up as much of the internal structure as possible, prior to dismantle the gable end, which should be...
04/05/2023

We have been shoring up as much of the internal structure as possible, prior to dismantle the gable end, which should begin this week.

Making progress towards the big job of rebuilding the gable end.
07/04/2023

Making progress towards the big job of rebuilding the gable end.

Planning permission for phase 2 of our project has now been granted. This will be to develop 2 3-bed homes within the ch...
04/04/2022

Planning permission for phase 2 of our project has now been granted. This will be to develop 2 3-bed homes within the chapel building.

ONE of the earliest purpose-built chapels in Bradford is to be converted into two homes.

Significant progress behind the house during the good weather last week...
07/06/2021

Significant progress behind the house during the good weather last week...

Back door and back window now fitted and landscaping of the rear has now begun. It is already looking so much more open ...
19/05/2021

Back door and back window now fitted and landscaping of the rear has now begun. It is already looking so much more open and lighter with the wall and shrub removed, and the first steps to level the 'gardens'.
In the foreground we have started the retaining walls which will surround the garden areas and separate from the rear parking.

Laid the second half of the roof this week. Definitely improved the parapet on the outside wall.And what a view!
26/02/2021

Laid the second half of the roof this week.
Definitely improved the parapet on the outside wall.
And what a view!

Old Roof removed and new one put on with added insulation.
15/02/2021

Old Roof removed and new one put on with added insulation.

The front room already feels bigger with an exposed fireplace.To flue or not to flue?
08/12/2020

The front room already feels bigger with an exposed fireplace.
To flue or not to flue?

Another big change was to bring the foot of the stairs up to H & S spec with a generous kite. And then some useful stora...
03/12/2020

Another big change was to bring the foot of the stairs up to H & S spec with a generous kite. And then some useful storage above for the upstairs bedroom.

New ensuite started in cottage top bedroom.
03/12/2020

New ensuite started in cottage top bedroom.