18/10/2023
Week 2 of the Refurb: βπ½
Part 2 - Master Bedroom: Why have we gone back-to-brick?π€
The front of the property had an ongoing leak from the guttering which entered the first floor main bedroom and caused high levels of moisture on the walls. π¦
We decided to go back-to-brick on the affected walls to air them out, whilst we wait for the guttering to be replaced. π§±
When the ceiling was stripped out we noticed that it had previously been lowered, so we want to open up space and gain additional height allowing more natural light to enter from the large window. πͺπ
The loft space is directly located above this bedroom, and we plan to create a storage room with flooring above the bedroom ceiling so building control advice has been sought. π€π½
Has anyone used building control from a private company? πΌ