APG Groundworks & Renovations

APG Groundworks & Renovations Welcome to APG, we’re your go-to team, from laying strong foundations to transforming your space.

Decorating commenced. It’s lovely to be able to get started with the residential seventh bridge!
16/07/2026

Decorating commenced. It’s lovely to be able to get started with the residential seventh bridge!

Loft is now insulated and boarded - aka roof sauna! But wow has that made a difference to cooling down the bedrooms to w...
16/07/2026

Loft is now insulated and boarded - aka roof sauna! But wow has that made a difference to cooling down the bedrooms to work in. The stilts worked a treat. Just lighting to go in then job done👍

12/07/2026

Adhesive fail. We have had a catastrophe though, we’ve had many boards not bonded to the walls. Currently being investigated by Siniat as many are loose, and have already been plastered. Didn’t make a difference to the substrate as it’s occurred on both new and old walls, with old walls having plenty of prep (blue grit). Had to halt for the moment until this is resolved - big setback to timeline though.

It’s been a full on couple of week with a hive of activity. Lots of progress and great to see things taking shape. Insul...
12/07/2026

It’s been a full on couple of week with a hive of activity. Lots of progress and great to see things taking shape.

Insulation on the pitched almost finished
Door linings prepped for dry liners
Plastering downstairs rooms
Dry lining
Toilet frame fitting
Shower former fitted
1st fit plumbing almost done
Electrician staying ahead 2nd fixing
Stilts, insulation and loft platforms started

All of this with hard core tradies in the sweltering heat ☀️ 🥵

Anglian Water made us so happy yesterday, we had the water meter heightened, and connected to the new pipework we instal...
27/06/2026

Anglian Water made us so happy yesterday, we had the water meter heightened, and connected to the new pipework we installed and we are official on our plumber mains water - 💦 doing a dance!! 🕺

It’s rather dusty inside! But we love those little paw prints ♥️
27/06/2026

It’s rather dusty inside! But we love those little paw prints ♥️

Shower tray in the master suite prepped, rest of sanitary wear ordered and arriving next week- it’s going to take shape ...
27/06/2026

Shower tray in the master suite prepped, rest of sanitary wear ordered and arriving next week- it’s going to take shape quickly in the next month.

Boarding is well and truly underway, followed very closely by the Plasteter.  Super tradesmen hitting it during the heat...
27/06/2026

Boarding is well and truly underway, followed very closely by the Plasteter. Super tradesmen hitting it during the heatwave too - hardcore!

First fix electrics finished and we are now ready for boarding and plastering. Last minute preparation before it’s start...
18/06/2026

First fix electrics finished and we are now ready for boarding and plastering. Last minute preparation before it’s starts to feel like a home!

1st fix electrics complete, top job that we’re super impressed with 💯👍 data cables all done, ventilation system installe...
24/05/2026

1st fix electrics complete, top job that we’re super impressed with 💯👍 data cables all done, ventilation system installed. Almost ready for boarding - just a few plumbing tasks then onto next stage 👌

Address

Crowland

Alerts

Be the first to know and let us send you an email when APG Groundworks & Renovations posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Category