10/09/2026
Bathroom time again π₯΅.
Full rip out (this one was really bad panelling)
All new pipe work
All new wastes under the floor so no ugly boxing
New floorboards throughout bathroom
Levelled joists and Plasterboarded ceiling
Tanking around shower area.
Tiled throughout
New suite fitted with black furniture.
New downlights and fan
10 day turnaround
Pretty happy with how its turned out π