New hut build nearing completion. Waiting on glass delivering and some finishing touches before the work is completed.
13/04/2026

New hut build nearing completion. Waiting on glass delivering and some finishing touches before the work is completed.

New bespoke new build beach hut under construction. Old hut has gone and space ready at Calshot πŸ˜ƒfor a lovely new one.
18/03/2026

New bespoke new build beach hut under construction. Old hut has gone and space ready at Calshot πŸ˜ƒfor a lovely new one.

New door trimmed and fitted to the Hello Outdoors studio.
24/02/2026

New door trimmed and fitted to the Hello Outdoors studio.

Change of scene working inside laying a new floor for the Hello Outdoors yoga studio in Lymington. Novel having a kettle...
30/01/2026

Change of scene working inside laying a new floor for the Hello Outdoors yoga studio in Lymington. Novel having a kettle and loo to hand!! Fabulous spot for yoga overlooking the marina across to the Isle of Wight.

More decking work despite the weather. And a new front door and some replacement cladding managed in between showers. No...
23/01/2026

More decking work despite the weather. And a new front door and some replacement cladding managed in between showers. Now for some sunshine and warmer temperatures so that I can paint!

Major deck overhaul here.
12/12/2025

Major deck overhaul here.

Rotting floor sections replaced despite wind and rain trying to soak me!! πŸ˜€
12/12/2025

Rotting floor sections replaced despite wind and rain trying to soak me!! πŸ˜€

Selected rotten side cladding boards replaced. Fresh paint all round (Sadolin Superdec "Limestone") and the lift up fron...
26/11/2025

Selected rotten side cladding boards replaced. Fresh paint all round (Sadolin Superdec "Limestone") and the lift up front lid "thingy" replaced. New sturdy lid with gas struts fitted either to allow easy lifting and pulling down.

Decking overhaul here and refitted so that it can lift up and down smoothly.
19/11/2025

Decking overhaul here and refitted so that it can lift up and down smoothly.

Autumn has been super busy with a variety of jobs. New timber deck built, two huts with extensive re-cladding, new doors...
10/11/2025

Autumn has been super busy with a variety of jobs. New timber deck built, two huts with extensive re-cladding, new doors and new support sleepers.

Calshot refurbishment whilst the weather was still dry and mild. New outside cladding to both sides and the front. Rotti...
21/10/2025

Calshot refurbishment whilst the weather was still dry and mild. New outside cladding to both sides and the front. Rotting window cill replaced. New storm doors made and installed along with a new drip bead above the doors to offer better rain protection. Inside of hut lined with breathable membrane. Tongue and groove cladding to all walls and the ceiling. Storage box beach seat built. Nice and cosy.

Lots of interior painting here. Prep first of course including some new cladding on the front along with a new pair of d...
20/10/2025

Lots of interior painting here. Prep first of course including some new cladding on the front along with a new pair of doors. Old roof felt removed with new felt added. Exterior of hut painted too.

Address

Hollywood Lane
Lymington
SO419HD

Telephone

+447824117326

Website

Alerts

Be the first to know and let us send you an email when New Forest Beach Hut Repairs posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category