25/09/2026
FOREST HALL UPDATE. DOUBLE STOREY REAR EXTENSION
Ceiling framed and structured in as a new upper floor β
Joists and nogging put in to strengthen upper floor to hold weight β
Plaster stripped off wall β
11mm OSB boards to go in with 22mm moisture resistant boards to match exiating floor height β
Soil stact been took out as getting relocated β
All pumbing alterations have also been
done and notched into ceiling β
Just need hangers on the joists now to support and strengthen the joists abd noggings abit more ππ―
fans Everyone Active