The Property Flipper

The Property Flipper An innovative property company, looking for refurbishment projects, quick sales and repossessions.

Bungalow flip... completed it mate!Finally got this one over the line, despite Plymouth City Councils searches massively...
27/03/2026

Bungalow flip... completed it mate!

Finally got this one over the line, despite Plymouth City Councils searches massively delaying everything.

Hopefully the new buyers love it as much as we loved bringing it up to the 21st century.

On to the next one....watch this space

...and that's a wrap.The bungalow is all finished and on the market with  It's been a labour of love turning this run do...
02/10/2025

...and that's a wrap.

The bungalow is all finished and on the market with

It's been a labour of love turning this run down property into a brand new home for someone.

Plenty of weekends and late nights, aching bones and scraped knuckles, tip runs and washing paint out of hair.

Full details on Zoopla and Rightmove.

2 bed detached bungalow
Large driveway
Full rewire
New GCH and boiler
EV charge point
New kitchen and bathroom
Fully carpeted
New decoration throughout

£265k-£275k guide price


Some heavy shifts done this week to get the bungalow ready for carpetting.Multiple late nights⌚Back bedroom prepped, san...
21/09/2025

Some heavy shifts done this week to get the bungalow ready for carpetting.

Multiple late nights⌚

Back bedroom prepped, sanded, glossed, ceilings and walls painted 🛌
The Great Wall of Higher Compton painted. 🧱
Back patio weeded 🌵
Multiple tip runs
New light in the kitchen 💡
Plinths cut ✂️
Window sanded and painted 🪟
Willow screen fixed to wall

A tough week, but the end is nearly in sight 🕵️

Week  #13We have light 💡Loft ladders fixed 🪜Curtain poles fixed🎏Insulation laid over whole loft 🥵Doors and skirting sand...
14/09/2025

Week #13

We have light 💡
Loft ladders fixed 🪜
Curtain poles fixed🎏
Insulation laid over whole loft 🥵
Doors and skirting sanded 🏜️
Window frames prepped 🪟
Back garden tidied 🪏
Step joints laid
Scratch coat rendered on steps📶
Gutters cleared
Patio slabs powerwashed and prepped
Window sill caps fixed on

Carpets and vinyl chosen
Doors being hung this week
EPC booked in

Can see the end in sight now, but plenty of stuff still to do with

Week  #12 update Front steps set, waiting for a dry day to grout up🦶Replacement sink turned up and plumbed in. Shiny tap...
07/09/2025

Week #12 update

Front steps set, waiting for a dry day to grout up🦶
Replacement sink turned up and plumbed in. Shiny tap. 🚰
Fireplace hearth grouted and new skirting 👗
Skirting sanded and painted 🖌️
Window surrounds sanded and painted 🪟
Walls painted
Boiler cupboard put up🐦‍🔥
Hallway painted
New back door put in and skirting put on🚪

Knocking off the jobs one by one with

Week  #11 update  (missed a week last week) Water meter installed🚰Windows scrubbed, razor bladed, resealed, sanded, clea...
31/08/2025

Week #11 update (missed a week last week)

Water meter installed🚰
Windows scrubbed, razor bladed, resealed, sanded, cleaned and painted (3 coats) ⛱️
Kitchen fitted (wrong sink delivered!) looks nice though.
Pipes boxed in for electrics and bathroom plumbing 🪈
Hearth extended 🐦‍🔥
Garden weeded and levelled.🫜

Ploughing on through the endless list with

Internal and external doors ordered for next week🚪

Week  #10 update Bathroom window painted and sealed - looks gleaming 🌟Shower and screen fitted 🚿Bath panel fitted 🛁Tiles...
25/08/2025

Week #10 update

Bathroom window painted and sealed - looks gleaming 🌟
Shower and screen fitted 🚿
Bath panel fitted 🛁
Tiles sealed 🦭
Side of house fully painted
Front wall touched up
Patio prepped and painted 🪏
Lounge window sill stripped and prepped 🪟
Plumbing sorted in kitchen 🛠️
Kitchen units in - worktops and hob/cooker next weekend plus upstand and plinth 🍳
End panels to be trimmed ✂️
Hood on order





Cracking on with

Week  #9 update.Back of house painted🖌️Tiling grouted🀄Window board fitted 🪟Hearth tiles down🔥Rads plumbed in 🌡️Now have ...
18/08/2025

Week #9 update.

Back of house painted🖌️
Tiling grouted🀄
Window board fitted 🪟
Hearth tiles down🔥
Rads plumbed in 🌡️
Now have hot water
Half of garden weeded and tilled 🌿
Garden wall painted and repaired 🛠️

Knocking off the jobs one by one with

Kitchen being ordered next week then back to doing the rest of the inside.

Address

Plymouth
PL97NX

Opening Hours

Monday 8:30am - 5pm
Tuesday 8:30am - 5pm
Wednesday 8:30am - 5pm
Thursday 8:30am - 5pm
Friday 8:30am - 5pm
Saturday 8:30am - 5pm

Website

Alerts

Be the first to know and let us send you an email when The Property Flipper posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share