The Property Flipper

The Property Flipper An innovative property company, looking for refurbishment projects, quick sales and repossessions.

...and that's a wrap.The bungalow is all finished and on the market with  It's been a labour of love turning this run do...
02/10/2025

...and that's a wrap.

The bungalow is all finished and on the market with

It's been a labour of love turning this run down property into a brand new home for someone.

Plenty of weekends and late nights, aching bones and scraped knuckles, tip runs and washing paint out of hair.

Full details on Zoopla and Rightmove.

2 bed detached bungalow
Large driveway
Full rewire
New GCH and boiler
EV charge point
New kitchen and bathroom
Fully carpeted
New decoration throughout

£265k-£275k guide price


Some heavy shifts done this week to get the bungalow ready for carpetting.Multiple late nights⌚Back bedroom prepped, san...
21/09/2025

Some heavy shifts done this week to get the bungalow ready for carpetting.

Multiple late nights⌚

Back bedroom prepped, sanded, glossed, ceilings and walls painted 🛌
The Great Wall of Higher Compton painted. 🧱
Back patio weeded 🌵
Multiple tip runs
New light in the kitchen 💡
Plinths cut ✂️
Window sanded and painted 🪟
Willow screen fixed to wall

A tough week, but the end is nearly in sight 🕵️

Week  #13We have light 💡Loft ladders fixed 🪜Curtain poles fixed🎏Insulation laid over whole loft 🥵Doors and skirting sand...
14/09/2025

Week #13

We have light 💡
Loft ladders fixed 🪜
Curtain poles fixed🎏
Insulation laid over whole loft 🥵
Doors and skirting sanded 🏜️
Window frames prepped 🪟
Back garden tidied 🪏
Step joints laid
Scratch coat rendered on steps📶
Gutters cleared
Patio slabs powerwashed and prepped
Window sill caps fixed on

Carpets and vinyl chosen
Doors being hung this week
EPC booked in

Can see the end in sight now, but plenty of stuff still to do with

Week  #12 update Front steps set, waiting for a dry day to grout up🦶Replacement sink turned up and plumbed in. Shiny tap...
07/09/2025

Week #12 update

Front steps set, waiting for a dry day to grout up🦶
Replacement sink turned up and plumbed in. Shiny tap. 🚰
Fireplace hearth grouted and new skirting 👗
Skirting sanded and painted 🖌️
Window surrounds sanded and painted 🪟
Walls painted
Boiler cupboard put up🐦‍🔥
Hallway painted
New back door put in and skirting put on🚪

Knocking off the jobs one by one with

Week  #11 update  (missed a week last week) Water meter installed🚰Windows scrubbed, razor bladed, resealed, sanded, clea...
31/08/2025

Week #11 update (missed a week last week)

Water meter installed🚰
Windows scrubbed, razor bladed, resealed, sanded, cleaned and painted (3 coats) ⛱️
Kitchen fitted (wrong sink delivered!) looks nice though.
Pipes boxed in for electrics and bathroom plumbing 🪈
Hearth extended 🐦‍🔥
Garden weeded and levelled.🫜

Ploughing on through the endless list with

Internal and external doors ordered for next week🚪

Week  #10 update Bathroom window painted and sealed - looks gleaming 🌟Shower and screen fitted 🚿Bath panel fitted 🛁Tiles...
25/08/2025

Week #10 update

Bathroom window painted and sealed - looks gleaming 🌟
Shower and screen fitted 🚿
Bath panel fitted 🛁
Tiles sealed 🦭
Side of house fully painted
Front wall touched up
Patio prepped and painted 🪏
Lounge window sill stripped and prepped 🪟
Plumbing sorted in kitchen 🛠️
Kitchen units in - worktops and hob/cooker next weekend plus upstand and plinth 🍳
End panels to be trimmed ✂️
Hood on order





Cracking on with

Week  #9 update.Back of house painted🖌️Tiling grouted🀄Window board fitted 🪟Hearth tiles down🔥Rads plumbed in 🌡️Now have ...
18/08/2025

Week #9 update.

Back of house painted🖌️
Tiling grouted🀄
Window board fitted 🪟
Hearth tiles down🔥
Rads plumbed in 🌡️
Now have hot water
Half of garden weeded and tilled 🌿
Garden wall painted and repaired 🛠️

Knocking off the jobs one by one with

Kitchen being ordered next week then back to doing the rest of the inside.

Week  #8 update on our bungalow flip.Gravel all laid - 2tons of it🪨🪨🪨!!Side elevation painted.Backside paint first coatW...
10/08/2025

Week #8 update on our bungalow flip.

Gravel all laid - 2tons of it🪨🪨🪨!!
Side elevation painted.
Backside paint first coat
Windows scrubbed 🪟
Step fixed along with the wall parapet 🪜
New window handle 🪟
Finally got sink and toilet to stop leaking 🚽🚿
Bit of gardening and placing bark🌿🌿
Fire and surround fixed to wall🐦‍🔥
Bathroom tiled🀄now waiting for grouting. (Got most of it on myself)
New window seals installed
Downpipe fixed
Gutters cleaned

Been a busy week, still loads to do.

With


Week  #7 update Too much socialising this week but some stuff done.Two dumpy bags of gravel laid 🛍️New gate fixed ⛩️Toil...
04/08/2025

Week #7 update

Too much socialising this week but some stuff done.

Two dumpy bags of gravel laid 🛍️
New gate fixed ⛩️
Toilet and sink fixed. 🚽
Fascias and windows cleaned 🪟
Fire placed and surround sorted 🐦‍🔥
Lounge and kitchen mist coated 🖌️

One step back - driver knocked the coping stones off the wall 🧱

Week  #6.A week of outside stuff.Walls painted 🧱Heather planted 🌿Windows cleaned 🪟Room  #1 finished Laurels plantedNew  ...
27/07/2025

Week #6.

A week of outside stuff.

Walls painted 🧱
Heather planted 🌿
Windows cleaned 🪟
Room #1 finished
Laurels planted
New back gate⛩️
Gutters cleaned
Bath plumbing installed
New drive kerb put in 🚗
Downpipe straightened 🪈
Mist coating done throughout 🌫️
Fire place broken out 🔥

New windows coming this week and rads fitted.

Seems like a never ending list , but we must be making progress.

Week  #5 update and it's a family affair. Some serious shifts over the last week getting the monster walls painted.Wall ...
22/07/2025

Week #5 update and it's a family affair.

Some serious shifts over the last week getting the monster walls painted.

Wall capping finished, painted and grey stripe added.🧱
Foundations painted🖌️
Triffids ripped out from the garden🪴
New fence and gates built🤺
Patio cleaned 🫧
Bath plumbing in 🛀
Kitchen plumbing in🔪
First room prepped and being painted🪜
Second fix electrics finished ⚡⚡
New front door handle👌

Still a long way to go but starting to see what this place will become. 🌟🔭

Address

Plymouth
PL97NX

Opening Hours

Monday 8:30am - 5pm
Tuesday 8:30am - 5pm
Wednesday 8:30am - 5pm
Thursday 8:30am - 5pm
Friday 8:30am - 5pm
Saturday 8:30am - 5pm

Website

Alerts

Be the first to know and let us send you an email when The Property Flipper posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share