18/09/2023
Been a long time posting, customer discovered an old well on their property.
Rather than have it filled in they asked me to build it up and try and match with the existing brickwork on the outbuildings,
Reclaimed bricks used and lime motar ,internal top section was also rendered in lime . Depth was measured at around 55ft to the water level.
had a couple of dodgy moments when I sat on a thistle and nearly propelled myself down there haha