Total Prime Engineering, PT

Total Prime Engineering, PT Manufacture & Repair of Hydraulic & Pneumatic Cylinder. Manufacture & Stockiest of O-ring & Sealing element. Safety products of Uvex and Bata Industrial.

As a relatively new player in the sealing industry, Total Prime has won a significant respect and satisfaction for the customers through an impressive stock availability in the whole range of sizes as well as product knowledge in which ensuring the customers meet their needs upon cost effective. A stringent quality check, chemical compatibly resources, compound technical report as well as order da

tasheet detailed is at your demand for better examination. With the brand new & latest technology of 2 (two) CNC machines from SEAL MASTER-DMH up to 550mm & 1 (one) CNC machines from SEAL JET-ECONOMOS up to 350mm, Total Prime has been the market leader for Premium Quality Seals in the market. No boundaries in profile & sizes, we can manufacture in a minutes. The largest stockiest of standard o-rings, hydraulic+pneumatic seals, mechanical seals make us the most preferable company for one stop sealing solution. Seal designs and technology have improved considerably in recent years with introduction of the latest materials and design concepts, the performance and reliability levels have risen beyond expectations and our partner suppliers have invested heavily in the latest production methods, research and development. Apart from that , our partner suppliers has been award ISO 9001 : 2002 and QS- 9000 for their commitment in total quality system, certified by NSF and WRAS for drinking water applications and FDA certification for food and Drugs Industry as well as TS16949 for automotive industry. Core business area, Automotive, mobile equipment, oil and gas equipment, petrochemical, marine,steel mill, ship building, semiconductor, chip manufacturing, food and pharmaceutical, and general industry.

07/05/2026

Day 2 at PALMEX Indonesia 2026 -
successfully completed ✅

✨ Another remarkable moment at PALMEX Indonesia 2026 ✨
PT Total Prime Engineering proudly connected with industry leaders, partners, and professionals to explore innovation, collaboration, and future opportunities in the palm oil industry.
From valuable discussions to meaningful partnerships, every moment at PALMEX 2026 became part of our journey toward engineering excellence and sustainable industrial growth. 🤝⚙️
📍 PALMEX Indonesia 2026
📅 6-7 May 2026
💡 Engineering • Innovation • Partnership

palmoilindustry

07/05/2026

Day 1 at Palmex Indonesia 2026 — DONE. ✅

Great conversations, meaningful connections, and strong energy throughout the exhibition floor today.
Thank you to everyone who visited the Total Prime booth and shared insights about the future of the palm oil industry.

Excited for Day 2.
Let’s keep building the future, together. 🚀

06/05/2026

Day 1 at Palmex Indonesia 2026 — DONE. ✅

Great conversations, meaningful connections, and strong energy throughout the exhibition floor today.
Thank you to everyone who visited the Total Prime booth and shared insights about the future of the palm oil industry.

Excited for Day 2.
Let’s keep building the future, TOGETHER. 🚀

PALMEX Indonesia 2026 — We’re Ready. 🌴🌴The palm oil industry doesn’t slow down and neither do we.This is where serious p...
28/04/2026

PALMEX Indonesia 2026 — We’re Ready. 🌴🌴

The palm oil industry doesn’t slow down and neither do we.

This is where serious players meet, solve problems, and move forward.

At Total Prime, we bring real solutions:
🌴 Engineering support
🌴 Hydraulic system & repair
🌴 Sealing solutions
🌴 Industrial reliability

If uptime matters to you, you should be here.

📍 JIEXPO Jakarta
📅 6–7 May 2026
🕒 10.00 – 17.00
📌 Booth 215 & 216

Let’s talk. Let’s build. Let’s execute.

Let's DRIVE the Future, TOGETHER!! 🚀

Proud to receive this recognition from Euroricambi for our 2025 achievement.Real partners don’t step back in challenging...
22/04/2026

Proud to receive this recognition from Euroricambi for our 2025 achievement.

Real partners don’t step back in challenging times, they step UP. They stay. They deliver.

Built on trust, transparency, and unwavering support, this is the kind of partnership that drives long-term success.

This is not just collaboration. This is commitment.

Drive the Future, TOGETHER!! 🚀

100% Pressure Tested. No Compromise.Di Total Prime, setiap Hydraulic Hose yang kami produksi wajib melewati proses 100% ...
13/04/2026

100% Pressure Tested. No Compromise.

Di Total Prime, setiap Hydraulic Hose yang kami produksi wajib melewati proses 100% pressure test sebelum dikirim ke customer.

Bukan formalitas. Ini standar kami.

Kenapa ini penting?
Karena di sistem hydraulic:
Kebocoran kecil = downtime besar
Crimping tidak sempurna = potensi hose failure
Pressure tinggi = risiko keselamatan

Yang kami pastikan:
✔️ Crimping presisi & kuat
✔️ Zero leakage saat tekanan tinggi
✔️ Siap kerja dari hari pertama

No pressure? No performance.
No test? No delivery.

🚀 Drive the Future, TOGETHER!!

STOCK IS POWER. UPTIME IS EVERYTHING.Dalam industri alat berat, ketersediaan stock bukan sekadar support, ini adalah pen...
12/04/2026

STOCK IS POWER. UPTIME IS EVERYTHING.

Dalam industri alat berat, ketersediaan stock bukan sekadar support, ini adalah penentu hidup atau matinya operasional.
Downtime bukan pilihan.

Di Total Prime, kami memastikan Anda selalu siap dengan:

Euroricambi Gear
Niitsu Turbo Charger
Hydraulink & Parker Hose & Fitting
CaKKar Operator Seat

Untuk berbagai unit:
Caterpillar | Komatsu | Volvo | Mercedes-Benz | Hino | Scania | Iveco | dan lainnya

Dengan Inventory lebih dari €3,000,000 artinya lebih cepat, lebih siap, tanpa tunggu lama.

Kenapa Total Prime?
✔ Kualitas premium
✔ Ready stock yang kuat
✔ Respons cepat & solusi tepat

Jangan biarkan unit Anda berhenti karena part tidak tersedia.

Hubungi Total Prime sekarang dan pastikan operasional Anda tetap berjalan tanpa hambatan.

From our factory floor to your world, Merry Christmas 🎄✨🎄Thank you for trusting us throughout the year.May this season b...
25/12/2025

From our factory floor to your world,
Merry Christmas 🎄✨🎄

Thank you for trusting us throughout the year.
May this season bring peace, safety, and new opportunities for all.

Cheers,
🎅🏼

RIG BSD #08 successfully rigged down following completion of drilling operations. Well secured as per program and handed...
29/11/2025

RIG BSD #08 successfully rigged down following completion of drilling operations. Well secured as per program and handed over to the next phase team.

Rig equipment demobilized in a safe manner and crew performance was excellent with high operational disciplin.

Thank you once again for the trust.

Address

Jalan Kedoya Raya No. 1, Kedoya Selatan, Kebon Jeruk
Jakarta
11520

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00

Telephone

+622158353959

Alerts

Be the first to know and let us send you an email when Total Prime Engineering, PT posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Total Prime Engineering, PT:

Share