Land Surveying Total Station Training Institute

Land Surveying Total Station Training Institute Learn Total Station Benchmark Shifting TopoSurvey with CADD Software Data Representation Call 9810476579

πŸŒ‰ π‚πŽππ’π“π‘π”π‚π“πˆπŽπ 𝐒𝐄𝐐𝐔𝐄𝐍𝐂𝐄 π…πŽπ‘ 𝐀 πŒπ€π‰πŽπ‘ ππ‘πˆπƒπ†π„ ππ‘πŽπ‰π„π‚π“Construction of a major bridge is a carefully planned process. Every s...
07/06/2026

πŸŒ‰ π‚πŽππ’π“π‘π”π‚π“πˆπŽπ 𝐒𝐄𝐐𝐔𝐄𝐍𝐂𝐄 π…πŽπ‘ 𝐀 πŒπ€π‰πŽπ‘ ππ‘πˆπƒπ†π„ ππ‘πŽπ‰π„π‚π“

Construction of a major bridge is a carefully planned process. Every stage must be completed in the right sequence to ensure safety, strength, quality, and smooth project delivery. Here is the typical construction sequence πŸ‘‡

1️⃣ Project Planning and Feasibility Study
πŸ“ Site selection
🌊 River, traffic, and flood studies
πŸ“‘ Environmental and statutory approvals
πŸ’° Preliminary cost and time planning

2️⃣ Survey and Investigation
πŸ“ Topographical survey
🧭 Bridge alignment and centreline fixing
🌍 Soil and geotechnical investigation
πŸ“ Benchmark and control-point establishment

3️⃣ Site Preparation
🚧 Access roads and working platforms
πŸ—οΈ Site offices, storage, and labour facilities
⚑ Temporary power, water, and lighting
🦺 Safety barricading and traffic diversion

4️⃣ Temporary and River-Training Works
🌊 Cofferdams, diversion channels, or temporary bunds
πŸ›Ά Working platforms in water
🧱 Protection against erosion and flooding

5️⃣ Foundation Construction
πŸ•³οΈ Pile boring, well foundation, or open excavation
πŸ”© Reinforcement cage installation
🧱 Concrete placement
πŸ§ͺ Pile integrity and load testing
πŸ—οΈ Pile cap or footing construction

6️⃣ Substructure Works
πŸ›οΈ Pier construction
🧱 Abutment construction
πŸ”¨ Pier caps and bearing pedestals
πŸ’§ Drainage and backfilling around abutments

7️⃣ Bearing Installation
βš™οΈ Bearing position, level, and alignment checking
🧱 Grouting and fixing
βœ… Inspection before superstructure placement

8️⃣ Superstructure Er****on
πŸ—οΈ Casting or fabrication of girders and segments
πŸš› Transportation to site
πŸͺ Lifting, launching, or segment er****on
πŸ”— Cross beams and diaphragm construction

9️⃣ Deck Slab Construction
πŸͺ΅ Formwork and staging
πŸ”© Reinforcement fixing
🧱 Concrete pouring
πŸ’¦ Curing and strength testing

πŸ”Ÿ Approach Works
πŸ›£οΈ Approach embankment
🚜 Compaction and pavement layers
🧱 Approach slab construction
🌧️ Drainage arrangements

1️⃣1️⃣ Finishing and Safety Works
🚧 Crash barriers, parapets, and railings
↔️ Expansion joints
🌧️ Drainage spouts
πŸ›£οΈ Wearing course
πŸ’‘ Lighting, signage, and road markings

1️⃣2️⃣ Testing and Handover
πŸ§ͺ Load testing
πŸ“ Alignment and level verification
πŸ” Final quality inspection
πŸ“‹ Defect correction and documentation
πŸŽ‰ Opening after approval

A successful bridge project depends on accurate planning, strong foundations, proper sequencing, strict quality control, and safe ex*****on. πŸ‘·β€β™‚οΈπŸŒ‰

31/08/2022

NEW BATCH OF LAND SURVEYING (USING AUTOLEVEL AND TOTAL STATION WILL START FROM 15 SEPTEMBER 2022
INTERESTED PLEASE WHATSAPP US AT +918603333379, DELHI, PUNE AND BANGALORE

16/10/2017

https://www.facebook.com/NobleCivilEngineering/

A dedicated community for Gulf civil engineers, MEP engineers, and construction professionals.
We share practical site knowledge, real project insights, career guidance, work experience discussions, and industry updates relevant to the Gulf constructions

Importance of Quantity Surveying..How is it Differ From Land Surveying....New Batch Starting From 10th September 2017Bha...
10/09/2017

Importance of Quantity Surveying..How is it Differ From Land Surveying....
New Batch Starting From 10th September 2017
Bhadanis Level 1 Quantity Surveying Civil
Bhadanis Level 2 Billing Engineering Civil
BhadanisLevel 3 Tendering and Procurement Mgmt. Civil
Bhadanis Level 4 Construction Contract Mgmt. Civil
Bhadanis Level 5 Construction Project Mgmt. Civil
Certificate Awarded by Central Govt. of India --Approved by Ministry of HRD , Govt. of INDIA + ISO Certified + CIOB Accredited
Branches are in Delhi Pune Bangalore Ghaziabad and Kolkata
Call
9810476579 (Delhi Branch)
9911259530 (Ghaziabad Branch)
9067245334 (Pune Branch)
8800339902 (Bangalore Branch)
8336858504 (Kolkata Branch)
Visit http://www.billingengineer.com/training-division.html
2550+ Candidates Trained Till Date..
A Renowned and Trusted Brand for Civil Engineers of India - BHADANI'S

Address

Delhi
110059

Alerts

Be the first to know and let us send you an email when Land Surveying Total Station Training Institute posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Land Surveying Total Station Training Institute:

Shortcuts

Share

Category