HEY CIVIL ENGINEERS !! GET TRAINED IN QUANTITY SURVEYING ESTIMATION BBS BILLING
CALL US AT +91-9990990844 / 981047657 / 8800339902 OR VISIT http://www.billingengineer.com/training-division.html
BHADANI’S Quantity Surveying in Estimation Civil - Construction
Level 1 - Duration :- 45 Days
Understanding the Role of BHADANI'S Quantity Surveying in the Construction Industry
Checklist of All Kinds of Civil Works at Site.
...
Construction Methodologies of Civil Works and How it works in Construction Industry
Construction Activities Identification Analysis and Report Generation
Making Project Chartered and Feasible Reports
Project Risk Analysis and Action Reports
Understanding and Reading the Structural and Architectural Drawings
Quantity Take off From the Drawings Like PCC , RCC , Reinforcement , Shuttering Etc.
Quantity Take off From the Architectural Drawings (Like Brickwork, Plaster Painting Putty Work Etc.)
Faster Take off Methodologies from Drawings of Civil
Analysis of All Kinds of Civil Drawings with Proper Presentation in Excel Formats
Management Information System (MIS) Generation and Preparation in Proper Formats as per IS Standards
Estimation of All Kinds of Civil Works
Estimation Technique During Design Phase
Estimation Technique During Pre-Construction Phase
Estimation Technique During Post-Construction Phase
Calculator Making of Concrete Steel, Brickwork, Plaster Painting Etc.
Pre-Engineered Building (PEB) Estimation
Costing Techniques of All Kinds of Civil Works (Concrete , Brikcwork, Earthwork, Finishing Work, Wood Work, Steel Work, Demolishing Works Etc.)
Costing Techniques- Risk Based Costing
Costing Techniques - Parametric Costing
Costing Techniques - Machinery Transport Management and Costing
Costing Techniques - Scope Estimation and Cost Analysis
S-Curve Reporting
Labour Deployment Planning As per Budget
Labour Economics and Productivity Analysis
Labour Output Analysis as per IS Code, Schedule of Rates and As per BHADANI'S New Technique
Economic Order Quantity (EOQ) and Management
Machinery Output Analysis as per Market Standards
Profit and Loss Analysis in Labour and Machinery Deployed at Construction Site
Daily Work Report (DWR) Preparation as per Quantity Surveyor Standards
Bar Bending Schedule (BBS) of All RCC Structures Like Footing Beams Slabs, Columns , Raft , Footing, Staircase Etc.
Bill of Quantity (BOQ) Take off (Material and Preparation)
Rate Analysis of All Kinds of Civil Works
Material Reconciliation Techniques from Contractor and Client's Side
Material Procurement Strategies as per the techniques used in Quantity Surveying
FREE LANCE Quantity Surveying with Hands on Practice
CALL US AT +91-9990990844 / 981047657 / 8800339902 OR VISIT http://www.billingengineer.com/training-division.html