08/09/2026
๐จ KURLA HALAV BRIDGE UPDATE
โข ๐ Metro Line 2B is being constructed over Halav Bridge, Kurla.
โข ๐ The Metro structure has around 3.5 metres of clearance above the existing bridge.
โข ๐ Residents have raised concerns about fire engines, ambulances and other emergency vehicles.
โข ๐ Heavy vehicles are being diverted, raising traffic and accessibility concerns.
โข ๐ Locals have also raised concerns about Ganeshotsav processions and emergency access.
โข ๐๏ธ MMRDA says traffic measures and road widening are being planned.
๐ Kurla, Mumbai
KURLA PROPERTIES
๐ 99309 90068
๐ฒ Follow us on WhatsApp: https://whatsapp.com/channel/0029VaAJF8WC1Fu3DuTvw03b