27/04/2024
[English Below]
οΏΌαααααααΈαα αααΌαα αααα»ααα·αααΆααΆαααααααααααααααΆαα αα·αααΆαααααααααααΆαααααααααααααααΆααααΆαα·ααΎαπ°πβ€οΈ
πααααΌαααΆααΆα
αααα αααααΆααααααααααααααααααααα αα·αααααΌαααα»ααα ααααααααα»α α‘α¨α ααΈα‘αΌααααααα
πααΆαα
αααΆαα α‘α§α α ααΆααα»ααααΆα (αααααααα·αα·ααα BOT ααΌα
ααααΆααΉαααααααααααΌαααααΏαααΏα)
πααΈααΆααα α
αΆααααΈαααααααΆααα ααααααΆαααααααααΆα―α α
αΌαααΆααααααααΆα ααΈα αα·ααααααα αΌααααααα»αααααααααααα
πααααααΆααα αααααα
ααα½α α€ αα½αααΆα ααααααααααΆα αααααααΆααα ααααααααα αα·αααααααααα
πα
ααα½ααααααΆααα ααα»α α‘,α¦ααΆαααΆαα (ααααα
α’αααααΆααααααααΈα)α
πααα αα αααΉαααΆαααΎ α‘α α m αααΉαααΆαααααα α¨α m αα·αααααα
α₯,α€m (αααααΆααα ααααα
ααΆααΆ α€,α§ m)
α αααααΆαα
ααΆααααααααα αααααααααΌαααΆααΆα
ααα α α£ αααααα ααααΆα α‘α‘ αααααα ααααΌαα’αααααΆααααααα α’α α¨ ααΈα‘αΌααααααα
πααααααααΆααααα α α€ ααααΆα (α
αΆααααααΎαααΆαααααα
α
α»αααααΆαα’α α’α€)α
πα’αααααααααααα ααΆαααΆααααααααααααα α
ααααΆα αα·ααααααααααΆαααΉααααααΌαααΆααααα
αα
α»αααααα ααΆααααααΎαααααα ααΆαα·ααααααααα·α αααααααααααααα»ααΆααααα ααΆαα’αα·αααααααααααααΈαααΆα
αααΎα ααΆααααααΈαααααα α’αα·ααααααααα·αααα ααΆααΆααΆααααα ααΆααΈαααααααα αα·αα
α·ααα
αΉααααα ααΆααα½αααΆαααααααααΆαα’αα·αααααααΌα ααααααα·α
αα
ααΈα€ ααααααααα»ααΆ ααΆααααααΎαααΆαααΆααααααααα
ααααααα αααααααααα»αααααααΈα αα» ααααααα ααααααααααααα αα·αααααααααααααααα ααΆααααα»αααΆαα’αα·ααααααΈαααα»ααα·αααααΌαααΈααααα αα·αααΆααααα»α ααΆαααΈαα
ααααΎααααααα’α
ααααααααα
Prek Chik Funan, I really support this project, it is full of benefits for our nation π°πβ€οΈ
π Navigation route: Connects the Mekong River system and the sea route with a total length of 180 km.
Cost: $ 1.7 billion (BOT investment project, same as expressway project)
π Location: From Takeo canal, cross Ta Ek canal, enter Ta Hing canal and continue to Kep sea.
Transit: 4 provinces, including Kandal, Takeo, Kampot and Kep.
Population: Total 1.6 million people (living on both sides of the canal).
π Size: 100m wide, 80m wide and 5.4m deep (Note: Ship depth 4.7m)
Infrastructure: 3 navigation valves, 11 bridges, 208 km of sidewalks.
Construction period: 04 years (construction starts at the end of 2024).
π Benefits: Reducing the time, distance and cost of current transportation, establishment of commercial areas and logistics centers, development of new satellite ports, expansion of agricultural, irrigation, aquaculture and animal husbandry development zones, support Development of Cambodia's Fourth Economic Pole, job creation at Sihanoukville Autonomous Port, Phnom Penh Autonomous Port and other ports, promotion of urban and urban development, and promotion of real estate growth.
FB
#ααααααααπ°π