T0tal Estimated C0st for a standard mini flat (0ne Bedroom Bungalow)
This comprehensive breakdown outlines the estimated costs for constructing a 2-bedrooms bungalow, ideal for family residences 0r rental properties.
โณ๏ธFOUNDATION WORK:
1. Digging (20 partitions): N40,000
2. Concrete Blinding (6 bags): N57,000
3. Mason for Concrete Blinding (2 masons): N20,000
4. Laying of Blocks (480 blocks on foundation level): N72,000
5. Plinth Beams Formwork (15 partitions): N24,000
6. Casting of Concrete for Plinth Beams (5 bags): N10,000
7. Mason to Dress Plinths: N10,000
8. Filling of the Foundation: N80,000
9. Oversite Concrete (37 bags): N74,000
10. Masons to Dress Oversite Concrete (2 masons): N20,000
Subtotal for Foundation Work:=(the above๐)
โณ๏ธSUPERSTRUCTURE:
1. Laying of Blocks(1,400 blocks): N210,000
2. Lintel Formwork (27 partitions): N54,000
3. Concrete Casting for Lintel (12 bags): N24,000
4. Mason to Dress Lintel: N10,000
5. Blocks Laying for Leveling (3masons+Servers): N60,000
6. Parapet Formwork: N200,000
7. Parapet Concrete Casting (10 bags): N25,000
8. Mason to Dress Parapet: N12,000
9. Roof Carpenter: N120,000
Subtotal for Superstructure:(add-up above๐)
โณ๏ธMATERIALS REQUIRED:
1. Blocks (2,400 units): N1,560,000
2. Cement (112 bags): N1,120,000
3. Purlins (170 units): N136,000
4. 2x4 Rafters (1,200 units): N156,000
5. Aluminium (80 square meters): N480,000
6. Sand (8 tippers): N960,000
7. Gravel (4 tippers): N480,000
8. Pegs (2 units): N4,000
9. Mason Rope (3 units): N1,800
10. Laterate (4 tippers): N160,000
11. Rod Y12mm (8 units): N104,000
Subtotal for Materials:(add-up the๐above)
Water Supply (Borehole or Water Tank)
1. Borehole (optional): N700k - #2,000,000
or
2. Water Tank (10,000 liters): N160,000 - N250,000
Total Estimated Cost๐๐
Avoid parapet to curtail cost
Handle the foundation stage differently to maximize cost too, many spend so much here,some foundation can work very well without some structural expenses๐
Avoid forms and sharps that demand a lot to achieve
Avoid some roofing sheet and if possible go for flat roof
During the finishing maximize and prioritize some space more and not all,yes give all a good touch but in some spaces donโt spend so much on expensive tiles
๐PLS ITโS HIGHLY IMPORTANT TO NOTE:
That the cost estimates of building in Nigeria๐ณ๐ฌ or anywhere in the world varies, it depends 0n various factors such as your preferences, location, land/soil type, design, sizes, time, market fluctuations and finishing choice.
Therefore,cost of building a house can never be fixed. Meaning it can be more than or less than the estimates here but not far from it. Itโs just t0 roughly guide you during planning.
๐ณ๐๐๐ , ๐บ๐๐๐๐, ๐ช๐๐๐๐๐๐ , & ๐ญ๐๐๐๐๐ ๐ MOSAN for more updates on anything Building, family & moral matters/topics.