4-storey boarding house site construction update.
26/11/2025

4-storey boarding house site construction update.

The building is secure because all concrete test samples are greater than the required strength. This is how we build to...
13/10/2025

The building is secure because all concrete test samples are greater than the required strength. This is how we build to secure life in times of calamity.πŸ˜‰πŸ˜ŠπŸ˜‡

30/09/2025
30/09/2025

I gained 26 followers in the past 90 days! Thank you all for your continued support. I could not have done it without you. πŸ™πŸ€—πŸŽ‰

Design and build by ETA Engineering Serviceβ˜ΊοΈπŸ˜ŠπŸ˜‡Schedule to be constructed on S.Y 2026.Project Owner: Amorealties Corpora...
27/06/2025

Design and build by ETA Engineering Serviceβ˜ΊοΈπŸ˜ŠπŸ˜‡
Schedule to be constructed on S.Y 2026.
Project Owner: Amorealties Corporation
Location: SLT Compound, Nasipit Talamban Cebu City

4-storey Boarding House: ongoing to 3rd floor beams reinforcement bars installation πŸ˜‰πŸ˜ŠπŸ˜‡
20/05/2025

4-storey Boarding House: ongoing to 3rd floor beams reinforcement bars installation πŸ˜‰πŸ˜ŠπŸ˜‡

Finished concrete pouring of 2nd floor slab and beams. The next schedule is columns, installation of CBH walls and 3rd f...
03/05/2025

Finished concrete pouring of 2nd floor slab and beams. The next schedule is columns, installation of CBH walls and 3rd floor slab & beams.πŸ˜‰πŸ˜ŠπŸ˜‡πŸ˜‡

28/04/2025

Designing a two-story dream house can be an exciting project. Here are some steps to help you get started:

# Step 1: Define Your Budget and Requirements
1. Determine how much you can afford to spend on the project.
2. Consider the number of bedrooms and bathrooms you need.
3. Think about the style and architecture you prefer.
4. Make a list of the features you want, such as a backyard, pool, or home office.

# Step 2: Choose a Building Site
1. Select a plot of land that suits your needs and budget.
2. Ensure the site is zoned for residential use and complies with local building regulations.
3. Consider factors like natural light, drainage, and accessibility.

# Step 3: Design the Floor Plan
1. Sketch a basic floor plan, including room layouts and dimensions.
2. Consider the flow of traffic and functionality of each room.
3. Think about energy efficiency and sustainability features.
4. Use online tools or software to create a more detailed and scaled design.

# Step 4: Select a Building Style and Exterior Finishes
1. Choose a style that suits your taste and complements the surrounding area.
2. Select exterior finishes like siding, brick, or stucco.
3. Consider the color scheme and overall aesthetic appeal.

# Step 5: Plan the Interior Design
1. Choose a color scheme and interior design style.
2. Select flooring, lighting fixtures, and plumbing fixtures.
3. Consider the layout and design of kitchens and bathrooms.
4. Think about storage and organization solutions.

# Step 6: Create a Detailed Design and Elevations
1. Use software or work with an architect to create detailed designs and elevations.
2. Include cross-sections, floor plans, and exterior elevations.
3. Make sure the design meets local building codes and regulations.

# Step 7: Obtain Necessary Permits and Approvals
1. Submit your design and plans to local authorities for approval.
2. Obtain necessary building permits and zoning approvals.
3. Address any issues or concerns raised by authorities.

# Step 8: Hire a Builder or Construction Team
1. Research and interview potential builders or construction teams.
2. Check their credentials, experience, and reputation.
3. Ensure they have the necessary licenses and insurance.
4. Get quotes and compare prices.

# Step 9: Construct and Inspect
1. Work with your builder or construction team to bring your design to life.
2. Conduct regular inspections to ensure the project is on track.
3. Address any issues or concerns promptly.

# Step 10: Finalize and Move In
1. Complete any final touches, such as landscaping or decorating.
2. Obtain a certificate of occupancy and finalize any necessary paperwork.
3. Move in and enjoy your beautiful two-story dream house!

Remember to always work with professionals, follow local regulations, and be patient throughout the process. Good luck!

Address

1. L-6, B8, Villa Alexandra-II, Estefania, Bacolod City; 2. Nasipit Talamban, Cebu City
Bacolod City
6100

Website

Alerts

Be the first to know and let us send you an email when ETA Engineering Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share

Category