22/01/2024
WOW ❗️❗️❗️ SAMAL - DAVAO BRIDGE 🎉🎉
LOOK | PREPARATION FOR CONSTRUCTION OF 3.98KM SAMAL ISLAND-DAVAO CITY (SIDC) CONNECTOR BRIDGE—LANDING SITE IN DAVAO CITY
With a cost of P23.039 billion, the Samal-Davao bridge is a two-way, four-lane 3.98-km bridge. It is 24 meters in width and has a vertical navigational clearance of up to 47 meters supported by two pylons with a height of 73 meters. It is expected to be finished by 2027.
📷 D nature's adventure
Source: https://www.dpwh.gov.ph/dpwh/news/28406