01/03/2024
Good news!
DPWH reports that the engineering services of Panay-Guimaras-Negros (PGN) Island Bridges is covered by a $56.6 Million loan agreement signed by the Department of Finance and KEXIM in 2022.
Yooshin Engineering Corporation in Joint Venture (JV) with Kyong-Ho Engineering & Architects Co., Ltd., Dohwa Engineering Co., Ltd., Soosung Engineering Co., Ltd. and Dasan Consultants Co., Ltd. are presently undertaking the engineering services for the 32.47-kilometer PGN Bridges connecting Panay Island, Guimaras Island and Negros Island.
The project has two (2) components: 13 kilometers Panay-Guimaras or Section A that will have a sea-crossing bridge length of 4.97 kilometers; and Guimaras-Negros or Section B or with a total length of 19.47 kilometers including sea-crossing bridge length of 13.11 kilometers.