07/08/2024
Attention Cavite residents! A new bus rapid transit system will be making its way through Lancaster New City! 🚌🌟 Check out the Cavite Bus Rapid Transit System (CBRT) and see which towns it will connect. Choose Lancaster for convenience and comfort!
𝗪𝗵𝗮𝘁 𝗶𝘀 𝘁𝗵𝗲 𝗖𝗮𝘃𝗶𝘁𝗲 𝗕𝘂𝘀 𝗥𝗮𝗽𝗶𝗱 𝗧𝗿𝗮𝗻𝘀𝗶𝘁 𝗣𝗿𝗼𝗷𝗲𝗰𝘁 (𝗖𝗕𝗥𝗧)?
The Cavite Bus Rapid Transit (CBRT) System is a planned mass transportation solution designed to address the growing mobility needs of Caviteños.
The whole CBRT project will have 3 terminals and 47 stations. This proposed mass transport system will offer reliable bus schedules, efficient ticketing, and a trip scheduling system that are all designed to promote convenient transportation, reduce traffic congestion, and pollution.
𝗪𝗵𝗮𝘁 𝗶𝘀 𝘁𝗵𝗲 𝗣𝘂𝗿𝗽𝗼𝘀𝗲 𝗼𝗳 𝗖𝗕𝗥𝗧 𝗣𝗿𝗼𝗷𝗲𝗰𝘁?
It aims to provide a reliable, efficient, and comfortable mode of transport within the province, connecting key areas and reducing traffic congestion.
𝗞𝗲𝘆 𝗙𝗲𝗮𝘁𝘂𝗿𝗲𝘀 𝗼𝗳 𝘁𝗵𝗲 𝗖𝗕𝗥𝗧 𝗦𝘆𝘀𝘁𝗲𝗺 𝗜𝗻𝗰𝗹𝘂𝗱𝗲𝘀:
𝗥𝗼𝘂𝘁𝗲
The system will span approximately 42 kilometers, passing through the cities and municipalities of:
1. Imus City
2. General Trias City
3. Tanza
4. Kawit
5 Trece Martires
6. Neighboring Area
It will also connect to the Paranaque Integrated Transport Exchange (PITX) in Metro Manila, providing seamless travel options for commuters.
𝗜𝗻𝗳𝗿𝗮𝘀𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗲
The CBRT will feature dedicated bus lanes, elevated stations for faster boarding and alighting, and modern bus terminals. These elements will ensure a smooth and efficient passenger experience.
𝗧𝗲𝗰𝗵𝗻𝗼𝗹𝗼𝗴𝘆
The system will incorporate advanced technologies such as electronic ticketing, real-time passenger information, and smart card systems to enhance convenience and accessibility for commuters.
𝗕𝘂𝘀 𝗙𝗹𝗲𝗲𝘁
The CBRT will utilize high-quality, air-conditioned buses equipped with modern amenities to provide a comfortable and enjoyable ride for passengers.
𝗕𝗲𝗻𝗲𝗳𝗶𝘁𝘀 𝗼𝗳 𝘁𝗵𝗲 𝗖𝗕𝗥𝗧 𝗦𝘆𝘀𝘁𝗲𝗺
𝗥𝗲𝗱𝘂𝗰𝗲𝗱 𝗧𝗿𝗮𝘃𝗲𝗹 𝗧𝗶𝗺𝗲
Dedicated bus lanes and efficient operations will significantly reduce travel time for commuters, allowing them to save time and energy.
𝗜𝗺𝗽𝗿𝗼𝘃𝗲𝗱 𝗠𝗼𝗯𝗶𝗹𝗶𝘁𝘆
The CBRT will provide a reliable and accessible transportation option for residents and workers in Cavite, promoting economic growth and development.
𝗥𝗲𝗱𝘂𝗰𝗲𝗱 𝗧𝗿𝗮𝗳𝗳𝗶𝗰 𝗖𝗼𝗻𝗴𝗲𝘀𝘁𝗶𝗼𝗻
By providing a mass transit alternative, the CBRT will help alleviate traffic congestion on major roads, leading to improved traffic flow and reduced travel time for all road users.
𝗘𝗻𝘃𝗶𝗿𝗼𝗻𝗺𝗲𝗻𝘁𝗮𝗹 𝗕𝗲𝗻𝗲𝗳𝗶𝘁𝘀
The CBRT is expected to reduce carbon emissions and air pollution compared to private vehicles, contributing to a cleaner and healthier environment.
𝗘𝗰𝗼𝗻𝗼𝗺𝗶𝗰 𝗴𝗿𝗼𝘄𝘁𝗵
The development and operation of the CBRT will create jobs and stimulate economic activity in the region.
The CBRT system is a promising project that has the potential to transform transportation in Cavite and improve the quality of life for its residents. It is seen as a crucial component of the province's development plans and is expected to contribute to its growth as a major metropolis.
𝗣𝗿𝗼𝗷𝗲𝗰𝘁 𝗨𝗽𝗱𝗮𝘁𝗲𝘀:
𝗠𝗮𝗿𝗰𝗵 𝟭𝟮, 𝟮𝟬𝟮𝟰
The Provincial Government of Cavite and the private sector proponents, Maplecrest Group Inc. (MGI), Profriends’ parent company, and the Megawide Construction Corporation jointly signed the Certificate of Successful Negotiation for the Cavite Bus Rapid Transit (CBRT) project.
𝗝𝘂𝗹𝘆 𝟯𝟬, 𝟮𝟬𝟮𝟰 - 𝐈𝐧𝐯𝐢𝐭𝐚𝐭𝐢𝐨𝐧 𝐭𝐨 𝐏𝐫𝐞-𝐪𝐮𝐚𝐥𝐢𝐟𝐲 𝐚𝐧𝐝 𝐒𝐮𝐛𝐦𝐢𝐭 𝐂𝐨𝐦𝐩𝐚𝐫𝐚𝐭𝐢𝐯𝐞 𝐏𝐫𝐨𝐩𝐨𝐬𝐚𝐥𝐬
The Provincial Government of Cavite (PGC) is inviting interested parties to pre-qualify and submit comparative proposals for their selection of the PGC's Joint venture partner that will develop the CAVITE BUS RAPID TRANSIT PROJECT.
The Provincial Government of Cavite (PGC) PGC invites local and international companies to submit comparative proposals under a Comparative Challenge Bidding Process for the development, operation, and maintenance of the Project with a term of thirty (30) years counting from the completion of the Construction works.
𝗙𝗼𝗿 𝗺𝗼𝗿𝗲 𝗶𝗻𝗳𝗼𝗿𝗺𝗮𝘁𝗶𝗼𝗻, 𝘆𝗼𝘂 𝗺𝗮𝘆 𝘃𝗶𝘀𝗶𝘁 𝘁𝗵𝗶𝘀 𝗹𝗶𝗻𝗸: https://ppp.gov.ph/.../invitation-to-pre-qualify-and.../
𝗙𝗼𝗿 𝗺𝗼𝗿𝗲 𝗶𝗻𝗳𝗼𝗿𝗺𝗮𝘁𝗶𝗼𝗻, 𝗮𝗯𝗼𝘂𝘁 𝗧𝗵𝗲 𝗖𝗮𝘃𝗶𝘁𝗲 𝗯𝘂𝘀 𝗥𝗮𝗽𝗶𝗱 𝗧𝗿𝗮𝗻𝘀𝗶𝘀𝘁 𝗦𝘆𝘀𝘁𝗲𝗺:
https://ppp.gov.ph/.../CBRT_Project-Information...